Cornice repairing method for aluminum mold and attached climbing frame
The invention relates to building construction, in particular to a cornice repairing method for an aluminum mold and an attached climbing frame. Comprising the following steps: S1, determining a passing position of a track of the attached climbing frame; s2, when the aluminum alloy formwork is installed, a T-shaped groove corresponding to the rail is reserved in a cornice of the window; s3, enabling the track of the attached climbing frame to penetrate through the T-shaped groove; s4, lifting construction of a lifting frame of the attached climbing frame; s5, after construction of the main body structure is completed, the attached climbing frame is dismantled; s6, outer wall operation is conducted; s7, T-shaped plates are prefabricated, and steel bars are pre-buried; s8, outer wall operation; s9, repairing the cornice; s10, bar planting glue is injected into the embedded pipe; s11, the T-shaped plates are placed in the T-shaped grooves, and the embedded steel bars are inserted into the embedded pipes; and S12, weather-proof sealant is smeared at the junction of the T-shaped plate and the structure. Construction is easy and convenient, the construction efficiency is high, the construction cost is reduced, climbing of the attached lifting frame is guaranteed, and the construction quality and construction safety of the cornice are guaranteed.
本发明涉及建筑施工,特别是一种用于铝模与附着式爬架的檐口修复方法。包括如下步骤:S1、确定附着式爬架的轨道的通行位置;S2、铝合金模板安装时,窗口的挑檐预留与轨道对应的T型凹槽;S3、附着式爬架的轨道贯穿T型凹槽;S4、附着式爬架的升降架提升施工;S5、主体结构施工完毕,拆除附着式爬架;S6、进行外墙作业;S7、预制T型板并预埋钢筋;S8、外墙作业;S9、檐口修复;S10、在预埋管的管内注植筋胶;S11、T型板放置到T型凹槽内,预埋钢筋插入预埋管内;S12、T型板与结构交界处抹耐候胶。本发明施工简便、施工效率高,降低施工成本,既保证附着式升降架的爬升又保证挑檐的施工质量和施工安全。
Cornice repairing method for aluminum mold and attached climbing frame
The invention relates to building construction, in particular to a cornice repairing method for an aluminum mold and an attached climbing frame. Comprising the following steps: S1, determining a passing position of a track of the attached climbing frame; s2, when the aluminum alloy formwork is installed, a T-shaped groove corresponding to the rail is reserved in a cornice of the window; s3, enabling the track of the attached climbing frame to penetrate through the T-shaped groove; s4, lifting construction of a lifting frame of the attached climbing frame; s5, after construction of the main body structure is completed, the attached climbing frame is dismantled; s6, outer wall operation is conducted; s7, T-shaped plates are prefabricated, and steel bars are pre-buried; s8, outer wall operation; s9, repairing the cornice; s10, bar planting glue is injected into the embedded pipe; s11, the T-shaped plates are placed in the T-shaped grooves, and the embedded steel bars are inserted into the embedded pipes; and S12, weather-proof sealant is smeared at the junction of the T-shaped plate and the structure. Construction is easy and convenient, the construction efficiency is high, the construction cost is reduced, climbing of the attached lifting frame is guaranteed, and the construction quality and construction safety of the cornice are guaranteed.
本发明涉及建筑施工,特别是一种用于铝模与附着式爬架的檐口修复方法。包括如下步骤:S1、确定附着式爬架的轨道的通行位置;S2、铝合金模板安装时,窗口的挑檐预留与轨道对应的T型凹槽;S3、附着式爬架的轨道贯穿T型凹槽;S4、附着式爬架的升降架提升施工;S5、主体结构施工完毕,拆除附着式爬架;S6、进行外墙作业;S7、预制T型板并预埋钢筋;S8、外墙作业;S9、檐口修复;S10、在预埋管的管内注植筋胶;S11、T型板放置到T型凹槽内,预埋钢筋插入预埋管内;S12、T型板与结构交界处抹耐候胶。本发明施工简便、施工效率高,降低施工成本,既保证附着式升降架的爬升又保证挑檐的施工质量和施工安全。
Cornice repairing method for aluminum mold and attached climbing frame
用于铝模与附着式爬架的檐口修复方法
MA ZHONGJUN (author) / LANG CHENGJIE (author) / CHEN SHUAI (author) / LIANG ZHANYUAN (author)
2023-08-29
Patent
Electronic Resource
Chinese
Device and method for installing and fixing climbing frame wall-attached support on aluminum mold
European Patent Office | 2022
|CEILING CORNICE COVER AND CEILING CORNICE COVER MOUNTING STRUCTURE
European Patent Office | 2023
|