A platform for research: civil engineering, architecture and urbanism
Method for treating overground suspended river of Yellow River
The invention discloses a simple method for treating a suspended river above the Yellow River. The key point of solving the Yellow River sediment deposition problem is to increase the water flow speed. The water flow speed is increased by two methods: 1, a narrow river channel is formed because the narrow river channel can increase the water flow speed; 2, forming a fall impact area; water has the trend of keeping the lowest energy under the action of a gravity field. A huge amount of Yellow River water contains huge potential energy, and we cannot lift the upstream of the whole Yellow River or lower the downstream of the whole Yellow River to increase the fall. However, from the estuary of the Yellow River to the upstream, the unobvious fall can be always concentrated to a point to form an obvious fall impact area; when a huge amount of Yellow River water passes through the fall, huge flowing potential energy is obtained, a large amount of silt at the fall is impacted, a large amount of silt is mixed into the heaving Yellow River water and flows into the Bohai bay through a narrow riverway, the roaring Yellow River water does not give any opportunity of re-deposition of the silt, and more river bottom silt is rolled up along the way to smoothly enter the sea.
一种治理黄河地上悬河的简易方法,解决黄河泥沙淤积问题的关键是能增加水流的速度。增加水流速度有两种办法:一、形成狭窄河道,因为狭窄的河道能增加水流速度;二、形成落差冲击区。因为水在重力场作用下有保持能量最低的趋势。巨量的黄河水含有巨大的势能,我们没有办法将整个黄河的上游抬高或下游降低来增加落差。但是我们可以从黄河入海口处开始直至上游处始终将不太明显的落差集中到一个点上形成明显的落差冲击区,巨量的黄河水通过落差处时获得了巨大的流动势能并冲击起落差处的大量泥沙混入波涛汹涌的黄河水经过狭窄的河道奔腾的流入渤海湾,翻腾咆哮的黄河水不会给泥沙任何再次沉积的机会并将沿途卷起更多的河底泥沙顺利入海。
Method for treating overground suspended river of Yellow River
The invention discloses a simple method for treating a suspended river above the Yellow River. The key point of solving the Yellow River sediment deposition problem is to increase the water flow speed. The water flow speed is increased by two methods: 1, a narrow river channel is formed because the narrow river channel can increase the water flow speed; 2, forming a fall impact area; water has the trend of keeping the lowest energy under the action of a gravity field. A huge amount of Yellow River water contains huge potential energy, and we cannot lift the upstream of the whole Yellow River or lower the downstream of the whole Yellow River to increase the fall. However, from the estuary of the Yellow River to the upstream, the unobvious fall can be always concentrated to a point to form an obvious fall impact area; when a huge amount of Yellow River water passes through the fall, huge flowing potential energy is obtained, a large amount of silt at the fall is impacted, a large amount of silt is mixed into the heaving Yellow River water and flows into the Bohai bay through a narrow riverway, the roaring Yellow River water does not give any opportunity of re-deposition of the silt, and more river bottom silt is rolled up along the way to smoothly enter the sea.
一种治理黄河地上悬河的简易方法,解决黄河泥沙淤积问题的关键是能增加水流的速度。增加水流速度有两种办法:一、形成狭窄河道,因为狭窄的河道能增加水流速度;二、形成落差冲击区。因为水在重力场作用下有保持能量最低的趋势。巨量的黄河水含有巨大的势能,我们没有办法将整个黄河的上游抬高或下游降低来增加落差。但是我们可以从黄河入海口处开始直至上游处始终将不太明显的落差集中到一个点上形成明显的落差冲击区,巨量的黄河水通过落差处时获得了巨大的流动势能并冲击起落差处的大量泥沙混入波涛汹涌的黄河水经过狭窄的河道奔腾的流入渤海湾,翻腾咆哮的黄河水不会给泥沙任何再次沉积的机会并将沿途卷起更多的河底泥沙顺利入海。
Method for treating overground suspended river of Yellow River
一种治理黄河地上悬河的方法
GUO DIANJU (author) / WU ZHIPING (author)
2023-09-01
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
How Has the Lower Yellow River Developed into a Two-Step-Suspended River?
British Library Conference Proceedings | 2004
|Significant CH4 Emissions from the Yellow River: Importance of Suspended Sediment
American Chemical Society | 2024
|Laboratory studies on impacts of suspended sediment on Yellow River Carp
British Library Conference Proceedings | 2012
|Residual Arsenic In Yellow River Fish and Effects of Suspended Sediment
British Library Conference Proceedings | 1995
|Pumping machine for treating sediment deposition in Yellow River