Construction method for awning between granaries of grain reserve warehouse
The invention relates to the technical field of inter-warehouse awning construction, and provides a grain storage warehouse inter-warehouse awning construction method which comprises the following steps that S1, supporting beams are constructed on the tops of adjacent grain depots; s2, a sliding rail is arranged between the adjacent grain depots, a sliding base is connected to the sliding rail in a sliding mode, and a winch is installed on the sliding base; s3, connecting a crane and two groups of winches to the arched color steel plate; s4, the arched color steel plates are hoisted to the positions above the two groups of grain depots through a crane; s5, the two ends of the arched color steel plate are opposite to the two sets of supporting beams correspondingly by winding steel wire ropes of two sets of winches; s6, the arched color steel plate is moved to the position above the installation position; s7, the arched color steel plate is located; s8, disconnecting the winch and the crane from the arched color steel plate; and S9, the steps S3-S8 are repeated till construction of other arched color steel plates is completed. The device has the effect of conveniently adjusting the position of the arched color steel plate.
本申请涉及仓间罩棚施工的技术领域,提出了一种粮食储备库仓间罩棚施工方法,包括以下步骤:S1:在相邻粮库顶部施作支撑梁;S2:在相邻粮库施作滑轨,滑轨上滑动连接有滑座,滑座上安装有卷扬机;S3:将吊机与两组卷扬机连接至拱形彩钢板上;S4:通过吊机将拱形彩钢板吊运至两组粮库上方;S5:通过两组卷扬机收卷自身钢丝绳使拱形彩钢板两端分别与两组支撑梁相对;S6:将拱形彩钢板移动至安装位置上方;S7:拱形彩钢板落位;S8:断开卷扬机、吊机两者与拱形彩钢板的连接;S9:重复步骤S3‑S8,直至完成其余拱形彩钢板施工。本申请具有便于拱形彩钢板位置调节的效果。
Construction method for awning between granaries of grain reserve warehouse
The invention relates to the technical field of inter-warehouse awning construction, and provides a grain storage warehouse inter-warehouse awning construction method which comprises the following steps that S1, supporting beams are constructed on the tops of adjacent grain depots; s2, a sliding rail is arranged between the adjacent grain depots, a sliding base is connected to the sliding rail in a sliding mode, and a winch is installed on the sliding base; s3, connecting a crane and two groups of winches to the arched color steel plate; s4, the arched color steel plates are hoisted to the positions above the two groups of grain depots through a crane; s5, the two ends of the arched color steel plate are opposite to the two sets of supporting beams correspondingly by winding steel wire ropes of two sets of winches; s6, the arched color steel plate is moved to the position above the installation position; s7, the arched color steel plate is located; s8, disconnecting the winch and the crane from the arched color steel plate; and S9, the steps S3-S8 are repeated till construction of other arched color steel plates is completed. The device has the effect of conveniently adjusting the position of the arched color steel plate.
本申请涉及仓间罩棚施工的技术领域,提出了一种粮食储备库仓间罩棚施工方法,包括以下步骤:S1:在相邻粮库顶部施作支撑梁;S2:在相邻粮库施作滑轨,滑轨上滑动连接有滑座,滑座上安装有卷扬机;S3:将吊机与两组卷扬机连接至拱形彩钢板上;S4:通过吊机将拱形彩钢板吊运至两组粮库上方;S5:通过两组卷扬机收卷自身钢丝绳使拱形彩钢板两端分别与两组支撑梁相对;S6:将拱形彩钢板移动至安装位置上方;S7:拱形彩钢板落位;S8:断开卷扬机、吊机两者与拱形彩钢板的连接;S9:重复步骤S3‑S8,直至完成其余拱形彩钢板施工。本申请具有便于拱形彩钢板位置调节的效果。
Construction method for awning between granaries of grain reserve warehouse
一种粮食储备库仓间罩棚施工方法
LIU SHIYUAN (author) / MOU LIBIN (author) / CHEN GANG (author) / WEI CHAODONG (author)
2023-09-01
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
The construction of flour mills and granaries
Engineering Index Backfile | 1924
|AWNING FIXATION, AWNING ACCESSORY AND AWNING ARRANGEMENTS
European Patent Office | 2024
|Awning overhanging structure, building and construction method of awning overhanging structure
European Patent Office | 2021
|Switzerland: Granaries in Switzerland
DataCite | 2015
|