A platform for research: civil engineering, architecture and urbanism
Construction equipment for rammed earth piling of foundation pit
The invention discloses construction equipment for rammed earth piling of a foundation pit, and relates to the technical field of rammed earth piling, the construction equipment comprises a bearing plate, one side of the bearing plate is fixedly connected with a moving mechanism, the top edge position of the bearing plate is fixedly connected with a piling mechanism, and a dust removal mechanism is arranged below the piling mechanism. A stabilizing mechanism is fixedly connected to the top of the bearing plate, a soil ramming mechanism is fixedly connected to one side of the stabilizing mechanism, when soil in construction needs to be rammed, a double-shaft motor is started firstly to drive a first rotating shaft to rotate, and under the rotating effect of the first rotating shaft, crawler wheels can be driven to rotate, and crawler belts can be driven to rotate; the whole device can operate more conveniently in a severe construction environment through movement of a crawler belt, a linear motor is started to drive a telescopic rod to stretch out, a buffer block slides forwards in a buffer groove, a buffer spring is extruded, and a sliding rod can be downwards inclined by an angle under the rotating effect of a first rotating bolt.
本发明公开了一种用于基坑进行夯土打桩的施工设备,涉及夯土打桩技术领域,包括承重板,所述承重板的一侧固定连接有移动机构,所述承重板的顶部边缘位置固定连接有打桩机构,所述打桩机构的下方设置有除尘机构,所述承重板的顶部固定连接有稳定机构,所述稳定机构的一侧固定连接有夯土机构,当需要对施工中的土壤进行夯实时,首先启动双轴电机带动转轴一的旋转,在转轴一的旋转效果下,可以带动履带轮的旋转,可以带动履带的旋转,利用履带的移动可以在恶劣的施工环境中更加方便整体装置的运行,启动直线电机带动伸缩杆的伸出,使得缓冲块在缓冲槽的内部向前滑动,对缓冲弹簧进行挤压,可以使滑动杆在第一转动栓的转动效果下向下进行角度倾斜。
Construction equipment for rammed earth piling of foundation pit
The invention discloses construction equipment for rammed earth piling of a foundation pit, and relates to the technical field of rammed earth piling, the construction equipment comprises a bearing plate, one side of the bearing plate is fixedly connected with a moving mechanism, the top edge position of the bearing plate is fixedly connected with a piling mechanism, and a dust removal mechanism is arranged below the piling mechanism. A stabilizing mechanism is fixedly connected to the top of the bearing plate, a soil ramming mechanism is fixedly connected to one side of the stabilizing mechanism, when soil in construction needs to be rammed, a double-shaft motor is started firstly to drive a first rotating shaft to rotate, and under the rotating effect of the first rotating shaft, crawler wheels can be driven to rotate, and crawler belts can be driven to rotate; the whole device can operate more conveniently in a severe construction environment through movement of a crawler belt, a linear motor is started to drive a telescopic rod to stretch out, a buffer block slides forwards in a buffer groove, a buffer spring is extruded, and a sliding rod can be downwards inclined by an angle under the rotating effect of a first rotating bolt.
本发明公开了一种用于基坑进行夯土打桩的施工设备,涉及夯土打桩技术领域,包括承重板,所述承重板的一侧固定连接有移动机构,所述承重板的顶部边缘位置固定连接有打桩机构,所述打桩机构的下方设置有除尘机构,所述承重板的顶部固定连接有稳定机构,所述稳定机构的一侧固定连接有夯土机构,当需要对施工中的土壤进行夯实时,首先启动双轴电机带动转轴一的旋转,在转轴一的旋转效果下,可以带动履带轮的旋转,可以带动履带的旋转,利用履带的移动可以在恶劣的施工环境中更加方便整体装置的运行,启动直线电机带动伸缩杆的伸出,使得缓冲块在缓冲槽的内部向前滑动,对缓冲弹簧进行挤压,可以使滑动杆在第一转动栓的转动效果下向下进行角度倾斜。
Construction equipment for rammed earth piling of foundation pit
一种用于基坑进行夯土打桩的施工设备
WANG YANCUI (author)
2023-09-05
Patent
Electronic Resource
Chinese
Autonomous equipment for seamless rammed earth construction
European Patent Office | 2020
|Rammed earth building construction
Engineering Index Backfile | 1943
|Piling equipment for pile foundation engineering construction
European Patent Office | 2023
|