A platform for research: civil engineering, architecture and urbanism
Tunnel concrete curing equipment and method
The invention discloses tunnel concrete curing equipment and method. The tunnel concrete curing equipment comprises a curing equipment framework, waterproof cloth, water spraying pipes, water absorption geotextile and water sealing geotextile. The waterproof cloth is arranged on the surface of poured concrete, the water absorption geotextile is arranged on the surface of the poured concrete, the water spraying pipes are arranged between the waterproof cloth and the water absorption geotextile, a plurality of water spraying holes are formed in the water spraying pipes, and the waterproof cloth, the water spraying pipes and the water absorption geotextile are all fixedly connected with the maintenance equipment framework. The water sealing geotextile is arranged on the lower edges of the two sides of the maintenance equipment framework, and the waterproof cloth is connected with the water sealing geotextile. The tunnel concrete curing equipment is low in construction cost, easy and convenient to machine, easy to operate and high in efficiency, construction materials can be recycled after being dismantled, the concrete defect elimination cost is reduced, water resources are saved, the environment is protected, the working environment is improved, and application and popularization can be achieved.
本发明公开了一种隧洞混凝土养护设备及方法,包括养护设备骨架、防水布、喷水水管、吸水土工布和封水土工布;所述吸水土工布设置在已浇筑混凝土的表面,若干所述喷水水管设置在防水布与吸水土工布之间,所述喷水水管上开设有若干喷水孔,所述防水布、喷水水管和吸水土工布均与养护设备骨架固定连接,所述封水土工布设置在养护设备骨架的两侧下边缘,所述防水布连接封水土工布。本发明隧洞混凝土养护设备施工成本低、加工简便、易操作、效率高、施工材料拆除后可再利用、减少混凝土消缺成本、节约水资源、保护环境、改善作业环境,可推广应用。
Tunnel concrete curing equipment and method
The invention discloses tunnel concrete curing equipment and method. The tunnel concrete curing equipment comprises a curing equipment framework, waterproof cloth, water spraying pipes, water absorption geotextile and water sealing geotextile. The waterproof cloth is arranged on the surface of poured concrete, the water absorption geotextile is arranged on the surface of the poured concrete, the water spraying pipes are arranged between the waterproof cloth and the water absorption geotextile, a plurality of water spraying holes are formed in the water spraying pipes, and the waterproof cloth, the water spraying pipes and the water absorption geotextile are all fixedly connected with the maintenance equipment framework. The water sealing geotextile is arranged on the lower edges of the two sides of the maintenance equipment framework, and the waterproof cloth is connected with the water sealing geotextile. The tunnel concrete curing equipment is low in construction cost, easy and convenient to machine, easy to operate and high in efficiency, construction materials can be recycled after being dismantled, the concrete defect elimination cost is reduced, water resources are saved, the environment is protected, the working environment is improved, and application and popularization can be achieved.
本发明公开了一种隧洞混凝土养护设备及方法,包括养护设备骨架、防水布、喷水水管、吸水土工布和封水土工布;所述吸水土工布设置在已浇筑混凝土的表面,若干所述喷水水管设置在防水布与吸水土工布之间,所述喷水水管上开设有若干喷水孔,所述防水布、喷水水管和吸水土工布均与养护设备骨架固定连接,所述封水土工布设置在养护设备骨架的两侧下边缘,所述防水布连接封水土工布。本发明隧洞混凝土养护设备施工成本低、加工简便、易操作、效率高、施工材料拆除后可再利用、减少混凝土消缺成本、节约水资源、保护环境、改善作业环境,可推广应用。
Tunnel concrete curing equipment and method
一种隧洞混凝土养护设备及方法
SUI XUEHUA (author) / JIANG YUEFENG (author) / LI YANGYANG (author) / TIAN WEI (author) / GAO WUGANG (author) / SUI XUELIANG (author) / LUO SHA (author) / LI PANPAN (author)
2023-09-05
Patent
Electronic Resource
Chinese
Tunnel concrete curing equipment and operation method thereof
European Patent Office | 2021
|CURING PRECAST CONCRETE TUNNEL LINING SEGMENTS
Online Contents | 1994
|