A platform for research: civil engineering, architecture and urbanism
Construction method for retaining wall of soil covering structure
The invention relates to a retaining wall construction method of a soil covering structure, which comprises the following steps of: 1, reserving a vertical joint bar on a top plate beam, chiseling the root part after the concrete pouring of a top plate is completed, if the pouring of the top plate on site is completed, adopting chemical bar planting, and chiseling the root part after the bar planting is completed; secondly, horizontal bars and tie bars are bound to form a stress whole; 3, binding the cement cushion block; 4, after watering, soil cloth is covered for maintenance; 5, the wall is coated with waterproof paint with the thickness of 1.5 mm; step 6, adding a waterproof coiled material and an anti-skid waterproof coating; 7, adding a root puncture resistant waterproof roll with the thickness of 4 mm; and 8, bricking a protective layer. According to the method, separate operation and construction are achieved, other working procedures are not affected, and the construction period is short.
本发明涉及一种覆土结构的挡土墙施工方法,步骤一:在顶板梁上预留竖向插筋,待顶板混凝土浇筑完成后对根部进行凿毛,若现场顶板已浇筑完成,则采用化学植筋,植筋完成后对根部进行凿毛;步骤二:进行水平筋、拉筋绑扎,使之成为一个受力整体;步骤三:绑扎水泥垫块;步骤四:浇水后覆土工布养护;步骤五:在墙体涂刷1.5mm厚防水涂料;步骤六:增加防水卷材以及抗滑防水涂料;步骤七:增加4mm厚耐根穿刺防水卷材;步骤八:砖砌保护层。本发明分片区单独作业施工,不影响其它工序开展,施工周期短。
Construction method for retaining wall of soil covering structure
The invention relates to a retaining wall construction method of a soil covering structure, which comprises the following steps of: 1, reserving a vertical joint bar on a top plate beam, chiseling the root part after the concrete pouring of a top plate is completed, if the pouring of the top plate on site is completed, adopting chemical bar planting, and chiseling the root part after the bar planting is completed; secondly, horizontal bars and tie bars are bound to form a stress whole; 3, binding the cement cushion block; 4, after watering, soil cloth is covered for maintenance; 5, the wall is coated with waterproof paint with the thickness of 1.5 mm; step 6, adding a waterproof coiled material and an anti-skid waterproof coating; 7, adding a root puncture resistant waterproof roll with the thickness of 4 mm; and 8, bricking a protective layer. According to the method, separate operation and construction are achieved, other working procedures are not affected, and the construction period is short.
本发明涉及一种覆土结构的挡土墙施工方法,步骤一:在顶板梁上预留竖向插筋,待顶板混凝土浇筑完成后对根部进行凿毛,若现场顶板已浇筑完成,则采用化学植筋,植筋完成后对根部进行凿毛;步骤二:进行水平筋、拉筋绑扎,使之成为一个受力整体;步骤三:绑扎水泥垫块;步骤四:浇水后覆土工布养护;步骤五:在墙体涂刷1.5mm厚防水涂料;步骤六:增加防水卷材以及抗滑防水涂料;步骤七:增加4mm厚耐根穿刺防水卷材;步骤八:砖砌保护层。本发明分片区单独作业施工,不影响其它工序开展,施工周期短。
Construction method for retaining wall of soil covering structure
一种覆土结构的挡土墙施工方法
LI DONGSHENG (author) / MA JUNHAO (author) / ZHANG CHI (author) / YE HUA (author) / FAN ZHENJIANG (author) / CHEN LIN (author) / WEI WEI (author)
2023-09-08
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
SOIL RETAINING WALL CONSTRUCTION METHOD AND SOIL RETAINING WALL CONSTRUCTED BY THIS
European Patent Office | 2019
European Patent Office | 2018
|SOIL RETAINING WALL CONSTRUCTION METHOD AND SOIL RETAINING WALL CONSTRUCTED BY THIS
European Patent Office | 2019
|CONSTRUCTION METHOD OF RETAINING WALL STRUCTURE, AND RETAINING WALL STRUCTURE
European Patent Office | 2024
|RETAINING WALL STRUCTURE AND CONSTRUCTION METHOD FOR RETAINING WALL
European Patent Office | 2020
|