Roof opening reverse ridge anti-seepage reinforcing structure and method
The invention discloses an anti-seepage reinforcing structure and method for a top plate opening reverse ridge, and the method comprises the following steps: S1, binding a steel reinforcement framework of a top plate, an upper reverse beam and a frame beam, anchoring steel reinforcements of the top plate into the upper reverse beam, and anchoring steel reinforcements of the upper reverse beam into the frame beam; s2, concrete pouring is conducted on a top plate, an upper returning beam and a frame beam; s3, after the top plate and the upper reversed beam structure reach the strength, a supporting frame at the bottom of the top plate and around the reserved hole is dismantled; and S4, when the reserved hole is closed, steel bars are planted on the upward-returning beam side, a steel bar framework at the reserved hole is bound, a formwork is closed at the bottom of the reserved hole, the formwork is fixed through a three-section type water stop screw rod in a formwork hanging mode, and concrete in the reserved hole is poured. According to the invention, the upward-returning beam is innovatively used as a reinforcing measure for the reserved hole, so that the reservation of the support frame body is avoided; the upper returning beam forms a reverse ridge around the reserved hole and is used for water blocking of the reserved hole, and safe and civilized construction is prevented from being affected.
本发明公开了一种顶板洞口反坎防渗加固结构及方法,方法包括以下步骤:S1:绑扎顶板、上反梁以及框架梁的钢筋骨架,其中顶板的钢筋锚入上返梁内部,上返梁的钢筋锚入框架梁内部;S2:进行顶板、上返梁以及框架梁的混凝土浇筑;S3:待顶板、上返梁结构达到强度后,拆除顶板底部包括预留洞口四周的支撑架;S4:预留洞口封闭时,上返梁侧植筋,绑扎预留洞口处的钢筋骨架,预留洞口底部封闭有模板,模板通过三段式止水螺杆进行吊模的方式进行固定,浇筑预留洞口内的混凝土。本申请创新的使用了上返梁作为预留洞口的加固措施,避免了支撑架体的预留;上返梁在预留洞口四周形成反坎,用于预留洞口阻水,避免影响安全文明施工。
Roof opening reverse ridge anti-seepage reinforcing structure and method
The invention discloses an anti-seepage reinforcing structure and method for a top plate opening reverse ridge, and the method comprises the following steps: S1, binding a steel reinforcement framework of a top plate, an upper reverse beam and a frame beam, anchoring steel reinforcements of the top plate into the upper reverse beam, and anchoring steel reinforcements of the upper reverse beam into the frame beam; s2, concrete pouring is conducted on a top plate, an upper returning beam and a frame beam; s3, after the top plate and the upper reversed beam structure reach the strength, a supporting frame at the bottom of the top plate and around the reserved hole is dismantled; and S4, when the reserved hole is closed, steel bars are planted on the upward-returning beam side, a steel bar framework at the reserved hole is bound, a formwork is closed at the bottom of the reserved hole, the formwork is fixed through a three-section type water stop screw rod in a formwork hanging mode, and concrete in the reserved hole is poured. According to the invention, the upward-returning beam is innovatively used as a reinforcing measure for the reserved hole, so that the reservation of the support frame body is avoided; the upper returning beam forms a reverse ridge around the reserved hole and is used for water blocking of the reserved hole, and safe and civilized construction is prevented from being affected.
本发明公开了一种顶板洞口反坎防渗加固结构及方法,方法包括以下步骤:S1:绑扎顶板、上反梁以及框架梁的钢筋骨架,其中顶板的钢筋锚入上返梁内部,上返梁的钢筋锚入框架梁内部;S2:进行顶板、上返梁以及框架梁的混凝土浇筑;S3:待顶板、上返梁结构达到强度后,拆除顶板底部包括预留洞口四周的支撑架;S4:预留洞口封闭时,上返梁侧植筋,绑扎预留洞口处的钢筋骨架,预留洞口底部封闭有模板,模板通过三段式止水螺杆进行吊模的方式进行固定,浇筑预留洞口内的混凝土。本申请创新的使用了上返梁作为预留洞口的加固措施,避免了支撑架体的预留;上返梁在预留洞口四周形成反坎,用于预留洞口阻水,避免影响安全文明施工。
Roof opening reverse ridge anti-seepage reinforcing structure and method
一种顶板洞口反坎防渗加固结构及方法
DUAN LIANRUI (author) / FU JIANWU (author) / ZHAO HUAYING (author) / HUANG YONG (author) / WANG YING (author) / WANG QINGHAI (author) / SONG YONGSHENG (author) / LIU XIAOBO (author) / GAO YANG (author) / GUO JIANTING (author)
2023-09-08
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Anti-seepage reinforcing structure and construction method