A platform for research: civil engineering, architecture and urbanism
Water conservancy project flood control device and flood control method thereof
The invention relates to the technical field of water conservancy projects, and discloses a water conservancy project flood control device and a flood control method thereof.The water conservancy project flood control device comprises a dam body, a flood control mechanism used for flood control is arranged on the side face of the dam body, and an alarm mechanism used for safety alarm is arranged on the side face of the dam body; an adjusting mechanism used for adjusting the displacement is arranged on the side face of the dam body, a flood prevention mechanism is arranged, when the water level of one side of the dam body is higher than the warning water level, water on one side of the dam body enters the power generation groove and enters the lifting groove through a connecting groove, and along with continuous increase of water in the lifting groove, a connecting rod and a flood prevention plate can move upwards, so that flood prevention is achieved. The purpose of flood control is achieved, manual control is not needed, when water on one side of the dam body is too much, along with continuous upward movement of the connecting rod and the protection plate, the water outlet groove is opened, redundant water can flow out of the water outlet groove, the purpose of automatic flood discharge is achieved, full-automatic operation is achieved, and use safety of the dam body can be guaranteed.
本发明涉及水利工程技术领域,且公开了一种水利工程防洪装置及其防洪方法,包括坝体,所述坝体的侧面上设置有用于防洪的防洪机构,所述坝体的侧面上设置有用于安全报警的报警机构,所述坝体侧面上设置有用于调节排水量的调节机构,设有防洪机构,当坝体一侧的水位高于警戒水位时,坝体一侧的水会进入发电槽内部,并通过连接槽进行升降槽内部,随着升降槽内部水的不断增多,可以实现连接杆和防洪板上移,实现防洪的目的,无需人工手动进行控制,而且当坝体一侧的水过多时,随着连接杆和防护板的不断上移,实现对出水槽的打开,多余的水会通过出水槽流出,实现自动泄洪的目的,全自动进行,可以保证坝体的使用安全。
Water conservancy project flood control device and flood control method thereof
The invention relates to the technical field of water conservancy projects, and discloses a water conservancy project flood control device and a flood control method thereof.The water conservancy project flood control device comprises a dam body, a flood control mechanism used for flood control is arranged on the side face of the dam body, and an alarm mechanism used for safety alarm is arranged on the side face of the dam body; an adjusting mechanism used for adjusting the displacement is arranged on the side face of the dam body, a flood prevention mechanism is arranged, when the water level of one side of the dam body is higher than the warning water level, water on one side of the dam body enters the power generation groove and enters the lifting groove through a connecting groove, and along with continuous increase of water in the lifting groove, a connecting rod and a flood prevention plate can move upwards, so that flood prevention is achieved. The purpose of flood control is achieved, manual control is not needed, when water on one side of the dam body is too much, along with continuous upward movement of the connecting rod and the protection plate, the water outlet groove is opened, redundant water can flow out of the water outlet groove, the purpose of automatic flood discharge is achieved, full-automatic operation is achieved, and use safety of the dam body can be guaranteed.
本发明涉及水利工程技术领域,且公开了一种水利工程防洪装置及其防洪方法,包括坝体,所述坝体的侧面上设置有用于防洪的防洪机构,所述坝体的侧面上设置有用于安全报警的报警机构,所述坝体侧面上设置有用于调节排水量的调节机构,设有防洪机构,当坝体一侧的水位高于警戒水位时,坝体一侧的水会进入发电槽内部,并通过连接槽进行升降槽内部,随着升降槽内部水的不断增多,可以实现连接杆和防洪板上移,实现防洪的目的,无需人工手动进行控制,而且当坝体一侧的水过多时,随着连接杆和防护板的不断上移,实现对出水槽的打开,多余的水会通过出水槽流出,实现自动泄洪的目的,全自动进行,可以保证坝体的使用安全。
Water conservancy project flood control device and flood control method thereof
一种水利工程防洪装置及其防洪方法
CHEN YU (author) / ZHANG PEI (author) / QIN MINGSHENG (author) / WANG SHUZHENG (author) / YANG SHEN (author) / SONG YANHONG (author) / GU QIN (author) / GAN LUWEI (author) / ZHANG TIANWEI (author) / HU HAIYAN (author)
2023-09-12
Patent
Electronic Resource
Chinese
Water conservancy project flood control device convenient to adjust
European Patent Office | 2023
|