High pile plate beam type wharf berthing component mounting device and mounting method thereof
The invention discloses a high-piled plate beam type wharf berthing component mounting device and a mounting construction method thereof, and relates to the technical field of high-piled plate beam type wharf berthing component mounting, in particular to a high-piled plate beam type wharf berthing component mounting device and a mounting construction method thereof. Comprising a small portal and a simple raft, the small portal comprises four stand columns and two longitudinal beams vertically fixed to the upper ends of the stand columns, the bottoms of the four stand columns are fixed to pile caps, safety limiting cross beams are arranged at the front ends of the two longitudinal beams, and the two longitudinal beams are each provided with a walking trolley; a hoisting main cross beam is arranged between the two walking trolleys; a main chain block is arranged at the lower end of the hoisting main cross beam; and an auxiliary chain block is arranged at the lower end of the safety limiting cross beam. According to the method, the difficulty that the berthing component cannot be installed due to the limitation of the lifting capacity of a tower crane and site conditions is effectively solved, meanwhile, the construction cost can be saved, the installation efficiency is high, and the construction period of wharfs and bank protection projects is guaranteed.
高桩板梁式码头靠船构件安装装置及其安装工法,涉及高桩板梁式码头靠船构件安装技术领域,特别涉及一种高桩板梁式码头靠船构件安装装置及其安装工法。包括小型门架和简易船筏,所述小型门架包括四根立柱和其上端垂直固定的两个纵梁,四根立柱的底部固定在桩帽上,两个纵梁的前端设置有安全限位横梁,两个纵梁上各设置有一个行走小车;两个行走小车之间设置有起吊主横梁;所述起吊主横梁的下端设置有主倒链;所述安全限位横梁的下端设置有辅助倒链。本发明有效解决了因塔吊起重量及场地条件限制而导致靠船构件无法安装的困难,同时能够节约施工成本,且安装效率较高,保证了码头及护岸工程工期。
High pile plate beam type wharf berthing component mounting device and mounting method thereof
The invention discloses a high-piled plate beam type wharf berthing component mounting device and a mounting construction method thereof, and relates to the technical field of high-piled plate beam type wharf berthing component mounting, in particular to a high-piled plate beam type wharf berthing component mounting device and a mounting construction method thereof. Comprising a small portal and a simple raft, the small portal comprises four stand columns and two longitudinal beams vertically fixed to the upper ends of the stand columns, the bottoms of the four stand columns are fixed to pile caps, safety limiting cross beams are arranged at the front ends of the two longitudinal beams, and the two longitudinal beams are each provided with a walking trolley; a hoisting main cross beam is arranged between the two walking trolleys; a main chain block is arranged at the lower end of the hoisting main cross beam; and an auxiliary chain block is arranged at the lower end of the safety limiting cross beam. According to the method, the difficulty that the berthing component cannot be installed due to the limitation of the lifting capacity of a tower crane and site conditions is effectively solved, meanwhile, the construction cost can be saved, the installation efficiency is high, and the construction period of wharfs and bank protection projects is guaranteed.
高桩板梁式码头靠船构件安装装置及其安装工法,涉及高桩板梁式码头靠船构件安装技术领域,特别涉及一种高桩板梁式码头靠船构件安装装置及其安装工法。包括小型门架和简易船筏,所述小型门架包括四根立柱和其上端垂直固定的两个纵梁,四根立柱的底部固定在桩帽上,两个纵梁的前端设置有安全限位横梁,两个纵梁上各设置有一个行走小车;两个行走小车之间设置有起吊主横梁;所述起吊主横梁的下端设置有主倒链;所述安全限位横梁的下端设置有辅助倒链。本发明有效解决了因塔吊起重量及场地条件限制而导致靠船构件无法安装的困难,同时能够节约施工成本,且安装效率较高,保证了码头及护岸工程工期。
High pile plate beam type wharf berthing component mounting device and mounting method thereof
高桩板梁式码头靠船构件安装装置及其安装工法
XU LISHAN (author) / ZHANG HAIKUO (author) / BIE ZHENJIANG (author) / WANG LIPING (author) / YANG HONGWU (author)
2023-09-12
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
High-pile wharf tough anti-seismic system and mounting method thereof
European Patent Office | 2024
|High-pile wharf with separated berthing, loading and unloading functions
European Patent Office | 2024
|