A platform for research: civil engineering, architecture and urbanism
Root pile construction method based on coastal dike
The invention relates to the field of root pile construction, in particular to a root pile construction method based on a coastal dike, which comprises the following steps: a root pile construction module drills a construction hole, a reinforcement cage is hung in the construction hole, and a data acquisition module acquires depth data and temperature data of the construction hole; the center control module adjusts filling data in the temperature adjusting cylinder assemblies according to the depth data and the temperature data through a preset temperature adjusting strategy, the root pile construction module installs the temperature adjusting cylinder assemblies on the inner surfaces of the construction holes according to the corresponding depths, the construction holes are filled, the root pile construction module pours the filled construction holes, and the root pile construction module is connected with the root pile construction module. According to the method, the temperature of the multiple depth intervals is adjusted through the prefabricated temperature adjusting cylinder assembly filled with the heat absorption or heat release material, so that the slurry is always within the preset temperature threshold value in the hardening process, the pile forming quality of the root pile is improved, and the service life of the root pile is prolonged.
本发明涉及树根桩施工领域,尤其涉及一种基于沿海堤防的树根桩施工方法,包括树根桩施工模块钻施工孔,将钢筋笼吊放于施工孔,数据获取模块获取施工孔深度数据和温度数据,中控模块根据深度数据和温度数据以预设调温策略对各调温筒组件内填充数据进行调节,树根桩施工模块将调温筒组件按对应深度分别安装于施工孔内表面,并对施工孔进行填充,树根桩施工模块将完成填充的所述施工孔进行浇筑,并以预设调温方式调节所述施工孔温度,本发明通过预制填充有吸热或放热材料的调温筒组件对若干深度区间的温度调节,使得浆料在硬化过程中一直处于预设温度阈值之间,提高了树根桩的成桩质量和使用寿命。
Root pile construction method based on coastal dike
The invention relates to the field of root pile construction, in particular to a root pile construction method based on a coastal dike, which comprises the following steps: a root pile construction module drills a construction hole, a reinforcement cage is hung in the construction hole, and a data acquisition module acquires depth data and temperature data of the construction hole; the center control module adjusts filling data in the temperature adjusting cylinder assemblies according to the depth data and the temperature data through a preset temperature adjusting strategy, the root pile construction module installs the temperature adjusting cylinder assemblies on the inner surfaces of the construction holes according to the corresponding depths, the construction holes are filled, the root pile construction module pours the filled construction holes, and the root pile construction module is connected with the root pile construction module. According to the method, the temperature of the multiple depth intervals is adjusted through the prefabricated temperature adjusting cylinder assembly filled with the heat absorption or heat release material, so that the slurry is always within the preset temperature threshold value in the hardening process, the pile forming quality of the root pile is improved, and the service life of the root pile is prolonged.
本发明涉及树根桩施工领域,尤其涉及一种基于沿海堤防的树根桩施工方法,包括树根桩施工模块钻施工孔,将钢筋笼吊放于施工孔,数据获取模块获取施工孔深度数据和温度数据,中控模块根据深度数据和温度数据以预设调温策略对各调温筒组件内填充数据进行调节,树根桩施工模块将调温筒组件按对应深度分别安装于施工孔内表面,并对施工孔进行填充,树根桩施工模块将完成填充的所述施工孔进行浇筑,并以预设调温方式调节所述施工孔温度,本发明通过预制填充有吸热或放热材料的调温筒组件对若干深度区间的温度调节,使得浆料在硬化过程中一直处于预设温度阈值之间,提高了树根桩的成桩质量和使用寿命。
Root pile construction method based on coastal dike
基于沿海堤防的树根桩施工方法
CAI XINGHAO (author) / WANG CHONGWU (author) / CHEN LI (author) / XIE LONGGEN (author) / LEE DONG-HO (author) / CAI FENGYAN (author) / ZHANG XIANGBIN (author) / HUANG TING (author) / ZHAN XIAOMIN (author) / ZHOU XIAOFENG (author)
2023-09-15
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Support pile, dike dam and construction method of dike dam
European Patent Office | 2024
|Engineering Index Backfile | 1947