A platform for research: civil engineering, architecture and urbanism
Novel regenerated block concrete pouring construction process for cast-in-place inclined plate
The invention relates to the technical field of cast-in-place inclined plate production, in particular to a cast-in-place inclined plate novel regeneration block concrete pouring construction technology which comprises the following construction steps that 1, a plurality of supporting beams are sequentially connected to the working ground in a lap joint mode; 2, an inclined bottom plate is installed on the top of the supporting beam; 3, additionally installing a long side plate and additionally installing a short side plate; 4, an additional steel bar layer is bound to the top face of the inclined bottom plate; 5, the additional steel bar layer is filled with waste concrete blocks; 6, recycled aggregate concrete is poured into gaps in the additional steel bar layer; 7, polishing the surface of the regenerated block-aggregate concrete structural body; and 8, the regenerated block-aggregate concrete structure body is cured, the construction procedure can be simplified, the labor intensity of operators can be reduced, and the construction period can be shortened.
本申请涉及现浇斜板生产的技术领域,尤其是涉及一种现浇斜板新型再生块体混凝土浇筑施工工艺,包括如下施工步骤:步骤1:把若干支撑梁依次搭接在工作地面上;步骤2:把斜底板安装在支撑梁的顶部;步骤3:加装长侧板和加装短侧板;步骤4:斜底板的顶面绑扎附加钢筋层;步骤5:附加钢筋层内填充废旧混凝土块体;步骤6:附加钢筋层内部缝隙浇筑再生骨料混凝土;步骤7:打磨再生块体‑骨料混凝土结构体的表面;步骤8:养护再生块体‑骨料混凝土结构体,可以简化施工工序,能够降低操作人员的劳动强度,缩短施工工期。
Novel regenerated block concrete pouring construction process for cast-in-place inclined plate
The invention relates to the technical field of cast-in-place inclined plate production, in particular to a cast-in-place inclined plate novel regeneration block concrete pouring construction technology which comprises the following construction steps that 1, a plurality of supporting beams are sequentially connected to the working ground in a lap joint mode; 2, an inclined bottom plate is installed on the top of the supporting beam; 3, additionally installing a long side plate and additionally installing a short side plate; 4, an additional steel bar layer is bound to the top face of the inclined bottom plate; 5, the additional steel bar layer is filled with waste concrete blocks; 6, recycled aggregate concrete is poured into gaps in the additional steel bar layer; 7, polishing the surface of the regenerated block-aggregate concrete structural body; and 8, the regenerated block-aggregate concrete structure body is cured, the construction procedure can be simplified, the labor intensity of operators can be reduced, and the construction period can be shortened.
本申请涉及现浇斜板生产的技术领域,尤其是涉及一种现浇斜板新型再生块体混凝土浇筑施工工艺,包括如下施工步骤:步骤1:把若干支撑梁依次搭接在工作地面上;步骤2:把斜底板安装在支撑梁的顶部;步骤3:加装长侧板和加装短侧板;步骤4:斜底板的顶面绑扎附加钢筋层;步骤5:附加钢筋层内填充废旧混凝土块体;步骤6:附加钢筋层内部缝隙浇筑再生骨料混凝土;步骤7:打磨再生块体‑骨料混凝土结构体的表面;步骤8:养护再生块体‑骨料混凝土结构体,可以简化施工工序,能够降低操作人员的劳动强度,缩短施工工期。
Novel regenerated block concrete pouring construction process for cast-in-place inclined plate
一种现浇斜板新型再生块体混凝土浇筑施工工艺
XIAO JINSHUI (author) / HUANG JIAN (author) / LI HUIJIAO (author) / MA YANG (author) / TAN SHANGFEI (author) / CHEN HANCHANG (author) / LAI XIAOJIANG (author)
2023-09-15
Patent
Electronic Resource
Chinese
Road construction method for pouring regenerated block concrete pavement
European Patent Office | 2024
|Inclined cast-in-place pile mounting and pouring process
European Patent Office | 2023
|Cast-in-place concrete pile pouring device and pouring process
European Patent Office | 2023
|Cast-in-place stair concrete pouring and tamping process
European Patent Office | 2022
|Concrete pouring construction method of cast-in-place box girder
European Patent Office | 2020
|