A platform for research: civil engineering, architecture and urbanism
River channel dike anti-impact reinforcing structure
The structure comprises a dike body, the upstream face of the dike body is provided with a first-stage side slope, a platform and a second-stage side slope from bottom to top, concrete protection layers are arranged outside the first-stage side slope, the platform and the second-stage side slope in a matched mode, and the section, located on the first-stage side slope, of each concrete protection layer is provided with a corrugated plate; a water slowing groove is formed in the section, located on the platform, of the concrete protection layer, broken stones are placed in the water slowing groove to form a water slowing broken stone layer, a concrete grid is arranged on the top of the concrete protection layer and located on the second-stage slope, green plants are planted in the concrete grid, and a plurality of protection plates are arranged above the concrete grid and located on the second-stage slope; by means of the structure, multiple reinforcement of the lifting protection is achieved, impact of water flow on the river embankment is relieved, and the service life of the lifting protection is prolonged.
本发明公开了一种河道堤防抗冲加固结构,包括堤防本体,堤防本体的迎水面由下而上设置有一级边坡、平台和二级边坡,一级边坡、平台和二级边坡的外部配合设置有混凝土防护层,混凝土防护层位于一级边坡的一段设置有波形板,混凝土防护层位于平台一段设置有缓水槽,缓水槽中放置有碎石形成缓水碎石层,混凝土防护层顶部且位于二级边坡上设置有混凝土栅格,混凝土栅格中种植绿植,混凝土栅格上方且位于二级边坡上设置有多个防护板;通过上述结构实现对提防的多重加固,减缓水流对河道堤防的冲击,提升提防的使用寿命。
River channel dike anti-impact reinforcing structure
The structure comprises a dike body, the upstream face of the dike body is provided with a first-stage side slope, a platform and a second-stage side slope from bottom to top, concrete protection layers are arranged outside the first-stage side slope, the platform and the second-stage side slope in a matched mode, and the section, located on the first-stage side slope, of each concrete protection layer is provided with a corrugated plate; a water slowing groove is formed in the section, located on the platform, of the concrete protection layer, broken stones are placed in the water slowing groove to form a water slowing broken stone layer, a concrete grid is arranged on the top of the concrete protection layer and located on the second-stage slope, green plants are planted in the concrete grid, and a plurality of protection plates are arranged above the concrete grid and located on the second-stage slope; by means of the structure, multiple reinforcement of the lifting protection is achieved, impact of water flow on the river embankment is relieved, and the service life of the lifting protection is prolonged.
本发明公开了一种河道堤防抗冲加固结构,包括堤防本体,堤防本体的迎水面由下而上设置有一级边坡、平台和二级边坡,一级边坡、平台和二级边坡的外部配合设置有混凝土防护层,混凝土防护层位于一级边坡的一段设置有波形板,混凝土防护层位于平台一段设置有缓水槽,缓水槽中放置有碎石形成缓水碎石层,混凝土防护层顶部且位于二级边坡上设置有混凝土栅格,混凝土栅格中种植绿植,混凝土栅格上方且位于二级边坡上设置有多个防护板;通过上述结构实现对提防的多重加固,减缓水流对河道堤防的冲击,提升提防的使用寿命。
River channel dike anti-impact reinforcing structure
一种河道堤防抗冲加固结构
YANG PING (author) / JIN KECHEN (author) / ZHANG LEXUAN (author) / TAN XINGMIN (author) / LI YUANYUAN (author) / ZHAO MING (author) / YIN JUNTAO (author) / YU SHANSHAN (author) / HAO LING (author) / XIAO JIANGHUI (author)
2023-09-19
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau