A platform for research: civil engineering, architecture and urbanism
Floating bridge and construction method thereof
The invention discloses a floating bridge which comprises at least one power floating body, at least one power floating body is internally provided with a first cavity and a second cavity, the first cavity is filled with foam, the second cavity is internally provided with a power mechanism and a winch, the power mechanism is used for driving a propeller arranged on the power floating body, and the winch is arranged on the power floating body. An inhaul cable is wound on the winch; the multiple unpowered floating bodies are filled with foam, through holes are formed in one side of the multiple unpowered floating bodies and one side of at least one power floating body and used for allowing the inhaul cable to penetrate through, and locking mechanisms used for locking the inhaul cable are further arranged at the through holes; and the bridge deck slab covers the at least one floating body and the plurality of unpowered floating bodies. The invention further provides a floating bridge construction method. The use of heavy machinery can be reduced, and the cost is low.
本发明公开了浮桥,包括:至少一个动力浮体,至少一个所述动力浮体内部具有第一腔室和第二腔室,所述第一腔室内填充有泡沫,所述第二腔室内设置有动力机构和绞盘,所述动力机构用于驱动设置在所述动力浮体上的螺旋桨,所述绞盘上缠绕有拉索;多个无动力浮体,多个所述无动力浮体内部填充有泡沫,多个所述无动力浮体和至少一个所述动力浮体一侧设置有通孔,用于供所述拉索穿过,所述通孔处还设置有用于锁定拉索的锁定机构;桥面板,其覆盖在至少一个所述浮体和多个所述无动力浮体上。本发明还提供了浮桥施工方法。本发明能够减少重型机械的使用,成本较低。
Floating bridge and construction method thereof
The invention discloses a floating bridge which comprises at least one power floating body, at least one power floating body is internally provided with a first cavity and a second cavity, the first cavity is filled with foam, the second cavity is internally provided with a power mechanism and a winch, the power mechanism is used for driving a propeller arranged on the power floating body, and the winch is arranged on the power floating body. An inhaul cable is wound on the winch; the multiple unpowered floating bodies are filled with foam, through holes are formed in one side of the multiple unpowered floating bodies and one side of at least one power floating body and used for allowing the inhaul cable to penetrate through, and locking mechanisms used for locking the inhaul cable are further arranged at the through holes; and the bridge deck slab covers the at least one floating body and the plurality of unpowered floating bodies. The invention further provides a floating bridge construction method. The use of heavy machinery can be reduced, and the cost is low.
本发明公开了浮桥,包括:至少一个动力浮体,至少一个所述动力浮体内部具有第一腔室和第二腔室,所述第一腔室内填充有泡沫,所述第二腔室内设置有动力机构和绞盘,所述动力机构用于驱动设置在所述动力浮体上的螺旋桨,所述绞盘上缠绕有拉索;多个无动力浮体,多个所述无动力浮体内部填充有泡沫,多个所述无动力浮体和至少一个所述动力浮体一侧设置有通孔,用于供所述拉索穿过,所述通孔处还设置有用于锁定拉索的锁定机构;桥面板,其覆盖在至少一个所述浮体和多个所述无动力浮体上。本发明还提供了浮桥施工方法。本发明能够减少重型机械的使用,成本较低。
Floating bridge and construction method thereof
浮桥及其施工方法
YANG JIAYAN (author)
2023-09-22
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Prestressed floating bridge temporary bridge and construction method thereof
European Patent Office | 2022
|Garden landscape floating bridge and construction method thereof
European Patent Office | 2020
|