A platform for research: civil engineering, architecture and urbanism
Seepage well, seepage well building method and improved erosion gully reclamation method
The invention provides a seepage well, a seepage well building method and an improved erosion gully reclamation method. The seepage well comprises fence layers, the fence layers are laid from the bottom of a pre-finished channel in the transverse direction of the channel, and a cuboid space of the seepage well is defined by the two fence layers laid in the channel; the geotechnical cloth completely covers the inner wall of the cuboid space of the seepage well; the gabion net is arranged on the inner side of the geotechnical cloth; an iron gauze is arranged at an opening in the top of the vertical pipe with the holes, and the vertical pipe is completely wrapped by geotechnical cloth; the rest space of the seepage well is filled with the filling stone, so that the top of the filling stone is flush with the top of the enclosure layer; the gabion net outer cover and the geotechnical cloth outer cover are arranged at the top of the filling stone; and the coarse sand layer fills the space between the top of the enclosure layer and the shoreline of the channel and between the top of the filling stone and the shoreline of the channel.
本公开提供了一种渗井、渗井筑造方法以及改进的侵蚀沟复垦方法。渗井包括:围挡层,所述围挡层从预先修整的沟道的底部沿着沟道的横向铺设,在沟道内铺设的两个所述围挡层限定出渗井的长方体空间;土工布,所述土工布完全覆盖渗井的长方体空间的内壁;石笼网,所述石笼网设置在土工布的内侧;带孔的竖管,所述带孔的竖管的顶部开口设置有铁丝网并且所述竖管用土工布完全包裹;填充石,所述填充石填充渗井的其余空间,使得填充石的顶部与围挡层的顶部齐平;石笼网外罩和土工布外罩,所述石笼网外罩和土工布外罩设置在填充石的顶部;以及粗砂层,所述粗砂层填充围挡层的顶部和填充石的顶部与沟道的岸线之间的空间。
Seepage well, seepage well building method and improved erosion gully reclamation method
The invention provides a seepage well, a seepage well building method and an improved erosion gully reclamation method. The seepage well comprises fence layers, the fence layers are laid from the bottom of a pre-finished channel in the transverse direction of the channel, and a cuboid space of the seepage well is defined by the two fence layers laid in the channel; the geotechnical cloth completely covers the inner wall of the cuboid space of the seepage well; the gabion net is arranged on the inner side of the geotechnical cloth; an iron gauze is arranged at an opening in the top of the vertical pipe with the holes, and the vertical pipe is completely wrapped by geotechnical cloth; the rest space of the seepage well is filled with the filling stone, so that the top of the filling stone is flush with the top of the enclosure layer; the gabion net outer cover and the geotechnical cloth outer cover are arranged at the top of the filling stone; and the coarse sand layer fills the space between the top of the enclosure layer and the shoreline of the channel and between the top of the filling stone and the shoreline of the channel.
本公开提供了一种渗井、渗井筑造方法以及改进的侵蚀沟复垦方法。渗井包括:围挡层,所述围挡层从预先修整的沟道的底部沿着沟道的横向铺设,在沟道内铺设的两个所述围挡层限定出渗井的长方体空间;土工布,所述土工布完全覆盖渗井的长方体空间的内壁;石笼网,所述石笼网设置在土工布的内侧;带孔的竖管,所述带孔的竖管的顶部开口设置有铁丝网并且所述竖管用土工布完全包裹;填充石,所述填充石填充渗井的其余空间,使得填充石的顶部与围挡层的顶部齐平;石笼网外罩和土工布外罩,所述石笼网外罩和土工布外罩设置在填充石的顶部;以及粗砂层,所述粗砂层填充围挡层的顶部和填充石的顶部与沟道的岸线之间的空间。
Seepage well, seepage well building method and improved erosion gully reclamation method
渗井、渗井筑造方法以及改进的侵蚀沟复垦方法
ZHANG XINGYI (author) / HAN XING (author) / GUO MINGMING (author) / HU WEI (author) / CHEN QIANG (author) / LI JIANYE (author) / WANG YUJUN (author) / ZHOU PENGCHONG (author) / CHEN ZHUOXIN (author) / LIU XIN (author)
2023-09-22
Patent
Electronic Resource
Chinese
European Patent Office | 2022
|European Patent Office | 2022
|Stationary flow through seepage well
Engineering Index Backfile | 1963
|