Formwork erecting construction method for closed constructional column
The invention provides a closed constructional column formwork erecting construction method, and belongs to the technical field of building construction. Formworks are laid, specifically, the formworks are laid on the two sides of the wall correspondingly, a pouring opening is reserved in one side of the upper portion of each formwork, a pouring piece is installed on the outer side of each pouring opening, the formworks and the pouring pieces are fixed through reinforcing ridges and split bolts, and inclined inserting plates are installed on the inner sides of the pouring pieces; a monitor is installed, specifically, the monitor is vertically installed between every two adjacent split bolts in the height direction and calibrated, and the monitor is used for monitoring the vertical state of the formwork in real time; pouring concrete; according to the construction method, the pouring piece is arranged on the upper portion of the formwork, so that the problem of labor and material waste caused by horn mouth chiseling after an existing constructional column is formed is solved, and meanwhile the deformation state of the formwork in the pouring process is detected in real time through the monitor; and the quality and safety of constructional column formwork erecting construction are ensured.
本发明提供了一种封闭构造柱支模施工方法,属于建筑施工技术领域,该方法包括构造柱定位;铺设模板,在墙体两侧分别铺设模板,在模板上部一侧预留浇筑口,在浇筑口外侧安装浇筑件,并通过加固楞和对拉螺栓将模板和浇筑件固定,在浇筑件内侧装入斜插板;安装监测器,在高度方向相邻的两个对拉螺栓之间垂直安装监测器并校准,监测器用于实时监测模板的垂直状态;混凝土浇筑;构造柱定型,监测器包括固定环、监测筒和活动环,该施工方法通过在模板上部设置浇筑件解决现有构造柱成型后喇叭口剔凿造成的人工及材料的浪费,同时通过监测器实时检测浇筑过程中模板的变形状态,保证了构造柱支模施工的质量和安全。
Formwork erecting construction method for closed constructional column
The invention provides a closed constructional column formwork erecting construction method, and belongs to the technical field of building construction. Formworks are laid, specifically, the formworks are laid on the two sides of the wall correspondingly, a pouring opening is reserved in one side of the upper portion of each formwork, a pouring piece is installed on the outer side of each pouring opening, the formworks and the pouring pieces are fixed through reinforcing ridges and split bolts, and inclined inserting plates are installed on the inner sides of the pouring pieces; a monitor is installed, specifically, the monitor is vertically installed between every two adjacent split bolts in the height direction and calibrated, and the monitor is used for monitoring the vertical state of the formwork in real time; pouring concrete; according to the construction method, the pouring piece is arranged on the upper portion of the formwork, so that the problem of labor and material waste caused by horn mouth chiseling after an existing constructional column is formed is solved, and meanwhile the deformation state of the formwork in the pouring process is detected in real time through the monitor; and the quality and safety of constructional column formwork erecting construction are ensured.
本发明提供了一种封闭构造柱支模施工方法,属于建筑施工技术领域,该方法包括构造柱定位;铺设模板,在墙体两侧分别铺设模板,在模板上部一侧预留浇筑口,在浇筑口外侧安装浇筑件,并通过加固楞和对拉螺栓将模板和浇筑件固定,在浇筑件内侧装入斜插板;安装监测器,在高度方向相邻的两个对拉螺栓之间垂直安装监测器并校准,监测器用于实时监测模板的垂直状态;混凝土浇筑;构造柱定型,监测器包括固定环、监测筒和活动环,该施工方法通过在模板上部设置浇筑件解决现有构造柱成型后喇叭口剔凿造成的人工及材料的浪费,同时通过监测器实时检测浇筑过程中模板的变形状态,保证了构造柱支模施工的质量和安全。
Formwork erecting construction method for closed constructional column
一种封闭构造柱支模施工方法
DING WENLING (author) / FENG LU (author) / XU XIAOYANG (author) / WANG GUOTAI (author)
2023-09-22
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
G01B
MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS
,
Messen der Länge, der Dicke oder ähnlicher linearer Abmessungen
/
G01C
Messen von Entfernungen, Höhen, Neigungen oder Richtungen
,
MEASURING DISTANCES, LEVELS OR BEARINGS
European Patent Office | 2024
|European Patent Office | 2021
|Construction method and structure for formwork erecting of constructional column
European Patent Office | 2024
|Formwork erecting construction method for post-construction wall pier constructional column
European Patent Office | 2022
|European Patent Office | 2021
|