A platform for research: civil engineering, architecture and urbanism
Hydropower plant
The hydropower station workshop comprises a workshop body, a rail and a connecting assembly, the rail is arranged in the workshop body, the rail is used for installing and transferring electromechanical equipment, the connecting assembly comprises a first installing part, a second installing part and rolling wheels, the first installing part is provided with a first installing part and a first matching part which are connected with each other, and the second installing part is provided with a second matching part; the second mounting part is provided with a second mounting part and a second matching part which are connected with each other, the first matching part and the second matching part are attached and connected through a fastener, at least part of the first mounting part and the second mounting part are oppositely arranged at intervals to define a mounting cavity, and at least part of the rail is arranged in the mounting cavity; at least one of the first mounting piece and the second mounting piece is suitable for being connected with a safety belt or a falling protector, and the rolling wheels are rotatably arranged in the mounting cavity and located above the track so that the connecting assembly can move on the track through the rolling wheels. The hydropower station workshop has the advantages of being simple in structure, high in safety performance and the like.
本发明公开了一种水电站厂房,所述水电站厂房包括厂房本体、轨道和连接组件,轨道设在厂房本体内,轨道用于机电设备安装、转运,连接组件包括第一安装件、第二安装件和滚轮,第一安装件具有彼此相连的第一安装部和第一配合部,第二安装件具有彼此相连的第二安装部和第二配合部,第一配合部和第二配合部贴合且通过紧固件相连,第一安装部的至少部分和第二安装部间隔相对设置以限定出安装腔,轨道的至少部分设在安装腔内,第一安装件和第二安装件至少一者适于与安全带或防坠器相连,滚轮可转动地设在安装腔内且位于轨道的上方,以便连接组件通过滚轮在轨道上移动。本发明实施例的水电站厂房具有结构简单、安全性能高等优点。
Hydropower plant
The hydropower station workshop comprises a workshop body, a rail and a connecting assembly, the rail is arranged in the workshop body, the rail is used for installing and transferring electromechanical equipment, the connecting assembly comprises a first installing part, a second installing part and rolling wheels, the first installing part is provided with a first installing part and a first matching part which are connected with each other, and the second installing part is provided with a second matching part; the second mounting part is provided with a second mounting part and a second matching part which are connected with each other, the first matching part and the second matching part are attached and connected through a fastener, at least part of the first mounting part and the second mounting part are oppositely arranged at intervals to define a mounting cavity, and at least part of the rail is arranged in the mounting cavity; at least one of the first mounting piece and the second mounting piece is suitable for being connected with a safety belt or a falling protector, and the rolling wheels are rotatably arranged in the mounting cavity and located above the track so that the connecting assembly can move on the track through the rolling wheels. The hydropower station workshop has the advantages of being simple in structure, high in safety performance and the like.
本发明公开了一种水电站厂房,所述水电站厂房包括厂房本体、轨道和连接组件,轨道设在厂房本体内,轨道用于机电设备安装、转运,连接组件包括第一安装件、第二安装件和滚轮,第一安装件具有彼此相连的第一安装部和第一配合部,第二安装件具有彼此相连的第二安装部和第二配合部,第一配合部和第二配合部贴合且通过紧固件相连,第一安装部的至少部分和第二安装部间隔相对设置以限定出安装腔,轨道的至少部分设在安装腔内,第一安装件和第二安装件至少一者适于与安全带或防坠器相连,滚轮可转动地设在安装腔内且位于轨道的上方,以便连接组件通过滚轮在轨道上移动。本发明实施例的水电站厂房具有结构简单、安全性能高等优点。
Hydropower plant
水电站厂房
ZHU YOUJIAO (author) / HE LIFEI (author) / YANG JIE (author) / FU SHIXI (author) / LIU CHENGFU (author) / QIAO JIFENG (author) / LI ZHICHENG (author) / ZHOU XIWEN (author) / YANG XIANWEI (author) / WANG CHENGYANG (author)
2023-09-22
Patent
Electronic Resource
Chinese
World hydropower engineering and hydropower plant construction
Online Contents | 1967
|World hydropower engineering and hydropower plant construction
Springer Verlag | 1967
|Construction of Artemare hydropower plant.
Online Contents | 2007
|PROJECT UPDATE: Pamilo hydropower plant -- Finland
Online Contents | 1997
Software to Optimise Hydropower Plant Design
British Library Conference Proceedings | 1997
|