A platform for research: civil engineering, architecture and urbanism
Concrete bridge deck pavement joint cutting device for bridge construction
The invention discloses a concrete bridge deck pavement joint-cutting device for bridge construction, and belongs to the field of joint-cutting devices.The concrete bridge deck pavement joint-cutting device comprises two parallel guide rails, rail grooves are formed in the top end faces of the guide rails, and walking mechanisms are fixedly connected to the two ends of the bottom end faces of the guide rails; a movable joint cutting assembly is arranged between the two guide rails, a stabilizing mechanism is arranged between the opposite side faces of the two guide rails, the walking mechanism specifically comprises a walking seat fixed to the bottom end faces of the guide rails, a double-shaft motor is embedded in the middle of the interior of the walking seat, and two output shafts of the double-shaft motor are fixedly connected with rolling wheels; the two sides of the double-shaft motor are each provided with at least three evenly-distributed fixing pieces. According to the automatic joint cutting device, the joint cutting device can be effectively and automatically guided for joint cutting, the working intensity of workers is relieved, the working time of the workers is shortened, the phenomenon that a cut joint deviates from a preset track in the joint cutting process is avoided, and the joint cutting effect is improved.
本发明公开了一种桥梁施工用混凝土桥面铺装切缝装置,属于切缝装置领域,包括两个并列的导轨,所述导轨的顶端面开设有轨槽,且导轨的底端面两端位置固定连接有行走机构;两个所述导轨之间设有可移动切缝组件,且两个所述导轨的相对侧面之间设有稳固机构,所述行走机构,具体包括:固定在导轨底端面的行走座,所述行走座的内部中间位置嵌设有双轴电机,且双轴电机的两个输出轴固定连接有滚轮,所述双轴电机的两侧分别设有至少三个均匀分布的固定件。本发明,能够有效自行引导切缝装置进行切缝,降低工作人员的工作强度与工作时间,且切缝过程中不会出现切缝偏离预设轨迹的现象,提高了切缝效果。
Concrete bridge deck pavement joint cutting device for bridge construction
The invention discloses a concrete bridge deck pavement joint-cutting device for bridge construction, and belongs to the field of joint-cutting devices.The concrete bridge deck pavement joint-cutting device comprises two parallel guide rails, rail grooves are formed in the top end faces of the guide rails, and walking mechanisms are fixedly connected to the two ends of the bottom end faces of the guide rails; a movable joint cutting assembly is arranged between the two guide rails, a stabilizing mechanism is arranged between the opposite side faces of the two guide rails, the walking mechanism specifically comprises a walking seat fixed to the bottom end faces of the guide rails, a double-shaft motor is embedded in the middle of the interior of the walking seat, and two output shafts of the double-shaft motor are fixedly connected with rolling wheels; the two sides of the double-shaft motor are each provided with at least three evenly-distributed fixing pieces. According to the automatic joint cutting device, the joint cutting device can be effectively and automatically guided for joint cutting, the working intensity of workers is relieved, the working time of the workers is shortened, the phenomenon that a cut joint deviates from a preset track in the joint cutting process is avoided, and the joint cutting effect is improved.
本发明公开了一种桥梁施工用混凝土桥面铺装切缝装置,属于切缝装置领域,包括两个并列的导轨,所述导轨的顶端面开设有轨槽,且导轨的底端面两端位置固定连接有行走机构;两个所述导轨之间设有可移动切缝组件,且两个所述导轨的相对侧面之间设有稳固机构,所述行走机构,具体包括:固定在导轨底端面的行走座,所述行走座的内部中间位置嵌设有双轴电机,且双轴电机的两个输出轴固定连接有滚轮,所述双轴电机的两侧分别设有至少三个均匀分布的固定件。本发明,能够有效自行引导切缝装置进行切缝,降低工作人员的工作强度与工作时间,且切缝过程中不会出现切缝偏离预设轨迹的现象,提高了切缝效果。
Concrete bridge deck pavement joint cutting device for bridge construction
一种桥梁施工用混凝土桥面铺装切缝装置
PU YAODONG (author) / JIN LIANHE (author) / DONG LIANG (author) / LI YINCHENG (author) / CHEN SUO (author)
2023-09-29
Patent
Electronic Resource
Chinese
Concrete pavement joint cutting device for highway bridge construction
European Patent Office | 2022
|Concrete pavement joint cutting device for highway bridge construction
European Patent Office | 2021
|Concrete pavement joint cutting device for highway bridge construction
European Patent Office | 2024
|Construction method for prestressed concrete bridge deck pavement
European Patent Office | 2024
|Arch bridge cement concrete bridge deck pavement joint edge covering structure
European Patent Office | 2023
|