A platform for research: civil engineering, architecture and urbanism
The invention discloses a building construction piling device which comprises a moving frame arranged on a piling machine, the top of the moving frame enables a lifting plate to move in the vertical direction through a pneumatic assembly, and the front side and the rear side of the lifting plate slide in the vertical direction on the inner side of the moving frame through the moving assembly. The invention relates to the technical field of building construction. According to the building construction piling device, the bearing stabilizing mechanism is arranged, rotation of a threaded rod is achieved through driving of a driving motor, a bearing frame is moved to the position below a prefabricated part to bear the prefabricated part, and the bearing frame is matched with a conveying assembly to drive a side sealing plate to bear and wrap a bearing rod; according to the device, the clamping assembly is arranged, the abutting assembly is synchronously driven to abut against and clamp the clamping assembly, so that the pile body can be conveniently fed, meanwhile, the problem that the pile body falls off during follow-up hoisting can be avoided, follow-up positioning and mounting are facilitated, and the construction piling efficiency after the continuous pile body is mounted is improved.
本发明公开了一种建筑施工打桩装置,包括设置在打桩机的移动架,所述移动架的顶部通过气动组件使得升降板进行竖直方向的移动操作,且升降板的前后侧通过移动组件在移动架的内侧进行竖直方向的滑动操作,本发明涉及建筑施工技术领域。该建筑施工打桩装置,通过设置有承载稳固机构,利用驱动电机的驱动实现螺纹杆的转动,并使得承载架移动至预制构件下方对预制构件进行承载,并配合传输组件带动侧封板对承载杆进行承载包裹,并同步带动了抵动组件对卡接组件的抵动卡接,从而方便于对桩体上料的同时,可以避免后续吊动时桩体产生掉落的问题,并方便于后续的定位安装,提高对连续桩体安装后施工打桩的效率。
The invention discloses a building construction piling device which comprises a moving frame arranged on a piling machine, the top of the moving frame enables a lifting plate to move in the vertical direction through a pneumatic assembly, and the front side and the rear side of the lifting plate slide in the vertical direction on the inner side of the moving frame through the moving assembly. The invention relates to the technical field of building construction. According to the building construction piling device, the bearing stabilizing mechanism is arranged, rotation of a threaded rod is achieved through driving of a driving motor, a bearing frame is moved to the position below a prefabricated part to bear the prefabricated part, and the bearing frame is matched with a conveying assembly to drive a side sealing plate to bear and wrap a bearing rod; according to the device, the clamping assembly is arranged, the abutting assembly is synchronously driven to abut against and clamp the clamping assembly, so that the pile body can be conveniently fed, meanwhile, the problem that the pile body falls off during follow-up hoisting can be avoided, follow-up positioning and mounting are facilitated, and the construction piling efficiency after the continuous pile body is mounted is improved.
本发明公开了一种建筑施工打桩装置,包括设置在打桩机的移动架,所述移动架的顶部通过气动组件使得升降板进行竖直方向的移动操作,且升降板的前后侧通过移动组件在移动架的内侧进行竖直方向的滑动操作,本发明涉及建筑施工技术领域。该建筑施工打桩装置,通过设置有承载稳固机构,利用驱动电机的驱动实现螺纹杆的转动,并使得承载架移动至预制构件下方对预制构件进行承载,并配合传输组件带动侧封板对承载杆进行承载包裹,并同步带动了抵动组件对卡接组件的抵动卡接,从而方便于对桩体上料的同时,可以避免后续吊动时桩体产生掉落的问题,并方便于后续的定位安装,提高对连续桩体安装后施工打桩的效率。