A platform for research: civil engineering, architecture and urbanism
Attached scaffold sunshade
The invention relates to the field of buildings, in particular to an attached scaffold sunshade which comprises a scaffold body, a first lifting assembly and a sunshade assembly, the first lifting assembly comprises a first motor and a first rail, the rail is arranged on the scaffold body, the sunshade assembly comprises a telescopic plate and a second motor, and the sunshade assembly is arranged on the first rail. The first motor drives the sunshade assembly to move along the first track, and the second motor drives the telescopic plate to be unfolded or folded in the horizontal direction. When the scaffold is used, the scaffold body is installed on a building to be built, the highest point of the scaffold body is higher than the building to be built by more than 5 meters, the sunshade assembly is moved to the highest point of the scaffold body along the first track through the first motor, then the telescopic plate is unfolded through the second motor, and sunshade of the high-rise building under construction can be achieved.
本发明涉及建筑领域,尤其涉及一种附着式脚手架遮阳棚,包括脚手架本体、第一升降组件和遮阳组件,第一升降组件包括第一电机和第一轨道,轨道装设于脚手架本体,遮阳组件包括伸缩板和第二电机,遮阳组件装设于第一轨道,且第一电机驱动遮阳组件沿第一轨道移动,第二电机驱动伸缩板沿水平方向张开或收纳。使用时,将脚手架本体安装于待建建筑,并使得脚手架本体的最高点高于待建建筑5米以上,通过第一电机将遮阳组件沿第一轨道移动到脚手架本体的最高点处,再通过第二电机将伸缩板展开即可实现对高层在建建筑的遮阳。
Attached scaffold sunshade
The invention relates to the field of buildings, in particular to an attached scaffold sunshade which comprises a scaffold body, a first lifting assembly and a sunshade assembly, the first lifting assembly comprises a first motor and a first rail, the rail is arranged on the scaffold body, the sunshade assembly comprises a telescopic plate and a second motor, and the sunshade assembly is arranged on the first rail. The first motor drives the sunshade assembly to move along the first track, and the second motor drives the telescopic plate to be unfolded or folded in the horizontal direction. When the scaffold is used, the scaffold body is installed on a building to be built, the highest point of the scaffold body is higher than the building to be built by more than 5 meters, the sunshade assembly is moved to the highest point of the scaffold body along the first track through the first motor, then the telescopic plate is unfolded through the second motor, and sunshade of the high-rise building under construction can be achieved.
本发明涉及建筑领域,尤其涉及一种附着式脚手架遮阳棚,包括脚手架本体、第一升降组件和遮阳组件,第一升降组件包括第一电机和第一轨道,轨道装设于脚手架本体,遮阳组件包括伸缩板和第二电机,遮阳组件装设于第一轨道,且第一电机驱动遮阳组件沿第一轨道移动,第二电机驱动伸缩板沿水平方向张开或收纳。使用时,将脚手架本体安装于待建建筑,并使得脚手架本体的最高点高于待建建筑5米以上,通过第一电机将遮阳组件沿第一轨道移动到脚手架本体的最高点处,再通过第二电机将伸缩板展开即可实现对高层在建建筑的遮阳。
Attached scaffold sunshade
一种附着式脚手架遮阳棚
WEI TINGZHI (author) / ZHOU JIAQI (author) / ZHANG ZIJIAN (author) / GAO JIAXING (author)
2023-09-29
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Assembled outer sunshade curtain mounting attached frame
European Patent Office | 2015
|SUNSHADE MEMBER, SUNSHADE UNIT, SUNSHADE BLOCK AND SUNSHADE
European Patent Office | 2017
|SUNSHADE MEMBER, SUNSHADE UNIT, SUNSHADE BLOCK, AND SUNSHADE
European Patent Office | 2019
|