A platform for research: civil engineering, architecture and urbanism
Construction engineering concrete chute
The invention provides a construction engineering concrete chute, and relates to the technical field of concrete chutes. The construction project concrete chute comprises a first chute body, a sliding groove is formed in the first chute body, grooves are formed in the two sides of the interior of the first chute body, sliding mechanisms are arranged in the grooves, each sliding mechanism comprises a rack, a gear, a supporting rod, a sliding block, a baffle and an electric sliding rail, the rack is connected with the gear in a meshed mode, and the supporting rod is connected with the sliding block in a meshed mode. The interior of the gear is fixedly connected to the outer wall of the supporting rod, and a connecting mechanism is arranged on the lower surface of the sliding mechanism. A sliding block slides in an electric sliding rail, the sliding block moves on a rack through movement of the sliding block, and therefore the effect that a connecting groove moves in a first chute body is achieved; through the design, the effect that the length of the first chute body can be adjusted according to different requirements is achieved.
本发明提供一种建设工程混凝土溜槽,涉及混凝土溜槽技术领域。该建设工程混凝土溜槽,包括第一溜槽体,所述第一溜槽体的内部开设有滑槽,所述第一溜槽体的内部两侧开设有凹槽,所述凹槽的内部设置有滑动机构,所述滑动机构包括齿条、齿轮、支撑杆、滑块、挡板和电动滑轨,所述齿条的与齿轮啮合连接,所述齿轮的内部固定连接在支撑杆的外壁,所述滑动机构的下表面设置有连接机构。通过滑块在电动滑轨的内部进行滑动,在通过滑块的移动从而达到滑块在齿条的上面进行移动,从而达到将连接槽在第一溜槽体的内部进行移动的效果,通过以上的设计从而达到可以根据不同的需求进行对第一溜槽体的长度进行调节的效果。
Construction engineering concrete chute
The invention provides a construction engineering concrete chute, and relates to the technical field of concrete chutes. The construction project concrete chute comprises a first chute body, a sliding groove is formed in the first chute body, grooves are formed in the two sides of the interior of the first chute body, sliding mechanisms are arranged in the grooves, each sliding mechanism comprises a rack, a gear, a supporting rod, a sliding block, a baffle and an electric sliding rail, the rack is connected with the gear in a meshed mode, and the supporting rod is connected with the sliding block in a meshed mode. The interior of the gear is fixedly connected to the outer wall of the supporting rod, and a connecting mechanism is arranged on the lower surface of the sliding mechanism. A sliding block slides in an electric sliding rail, the sliding block moves on a rack through movement of the sliding block, and therefore the effect that a connecting groove moves in a first chute body is achieved; through the design, the effect that the length of the first chute body can be adjusted according to different requirements is achieved.
本发明提供一种建设工程混凝土溜槽,涉及混凝土溜槽技术领域。该建设工程混凝土溜槽,包括第一溜槽体,所述第一溜槽体的内部开设有滑槽,所述第一溜槽体的内部两侧开设有凹槽,所述凹槽的内部设置有滑动机构,所述滑动机构包括齿条、齿轮、支撑杆、滑块、挡板和电动滑轨,所述齿条的与齿轮啮合连接,所述齿轮的内部固定连接在支撑杆的外壁,所述滑动机构的下表面设置有连接机构。通过滑块在电动滑轨的内部进行滑动,在通过滑块的移动从而达到滑块在齿条的上面进行移动,从而达到将连接槽在第一溜槽体的内部进行移动的效果,通过以上的设计从而达到可以根据不同的需求进行对第一溜槽体的长度进行调节的效果。
Construction engineering concrete chute
一种建设工程混凝土溜槽
ZHANG ZHIHUI (author) / ZHANG HAIBO (author) / ZHANG RUI (author) / NIU NINGNING (author) / LIU SHENGGUANG (author) / SUN RONGTING (author) / YUAN JIALI (author) / WANG QIXING (author)
2023-09-29
Patent
Electronic Resource
Chinese
Imbricated reinforced concrete chute construction process
European Patent Office | 2022
|