A platform for research: civil engineering, architecture and urbanism
Heteropalace pagoda
The invention discloses a celestial palace pagoda, and belongs to the technical field of pagoda. The method comprises the steps of lifting; a seat bucket; a cross arch; a three-bucket lifting gong; a six-bucket lifting gong; the head is heavy; font; a cloud head; stillingia; the seat bucket, the bucket three-lift arch, the cross arch, the bucket six-lift arch, the head arch, the top arch and the cloud head are sequentially connected in a matched manner; the first layer is a seat bucket, the second layer in the surface width direction is a cross arch, the third layer is an upper layer, and the fourth layer is an upper layer; in the depth direction, the second layer is a three-bucket-lift gong, and the third layer is a six-bucket-lift gong; a first connecting machine is arranged at the center of the union and is perpendicular to the union; the cloud head is overlaid on one end, with the crested head, of the union head; a second connecting machine is overlapped on the first connecting machine; the stillinger is installed at the upper end of the cloud head. According to the invention, all components can be fixedly connected through insertion, so that non-professional personnel can conveniently mount and dismount; components cannot be damaged during disassembly and assembly, the disassembled components can be reused, the construction period can be shortened, and energy conservation and environmental protection are achieved.
本发明公开了一种天后宫戏台斗栱,属于斗栱技术领域。其包括升;坐斗;十字栱;斗三升栱;斗六升栱;头昂;由昂;云头;梓桁;坐斗、斗三升栱、十字栱、斗六升栱、头昂、由昂、云头依次配合连接;第一层为坐斗,面宽方向第二层为十字栱,第三层为头昂,第四层叠加一层由昂;进深方向第二层为斗三升栱,第三层为斗六升栱;由昂的正心处设置有第一连机,第一连机与由昂垂直;云头叠加于由昂上具有凤头昂的一端;第一连机上叠加有第二连机;梓桁安装在云头上端。本发明各个构件之间通过插接即可实现固定连接,从而便于非专业人员的安装和拆卸;拆装的同时不会损坏构件,可使拆卸的构件重复使用,有利于缩短工期,节能环保。
Heteropalace pagoda
The invention discloses a celestial palace pagoda, and belongs to the technical field of pagoda. The method comprises the steps of lifting; a seat bucket; a cross arch; a three-bucket lifting gong; a six-bucket lifting gong; the head is heavy; font; a cloud head; stillingia; the seat bucket, the bucket three-lift arch, the cross arch, the bucket six-lift arch, the head arch, the top arch and the cloud head are sequentially connected in a matched manner; the first layer is a seat bucket, the second layer in the surface width direction is a cross arch, the third layer is an upper layer, and the fourth layer is an upper layer; in the depth direction, the second layer is a three-bucket-lift gong, and the third layer is a six-bucket-lift gong; a first connecting machine is arranged at the center of the union and is perpendicular to the union; the cloud head is overlaid on one end, with the crested head, of the union head; a second connecting machine is overlapped on the first connecting machine; the stillinger is installed at the upper end of the cloud head. According to the invention, all components can be fixedly connected through insertion, so that non-professional personnel can conveniently mount and dismount; components cannot be damaged during disassembly and assembly, the disassembled components can be reused, the construction period can be shortened, and energy conservation and environmental protection are achieved.
本发明公开了一种天后宫戏台斗栱,属于斗栱技术领域。其包括升;坐斗;十字栱;斗三升栱;斗六升栱;头昂;由昂;云头;梓桁;坐斗、斗三升栱、十字栱、斗六升栱、头昂、由昂、云头依次配合连接;第一层为坐斗,面宽方向第二层为十字栱,第三层为头昂,第四层叠加一层由昂;进深方向第二层为斗三升栱,第三层为斗六升栱;由昂的正心处设置有第一连机,第一连机与由昂垂直;云头叠加于由昂上具有凤头昂的一端;第一连机上叠加有第二连机;梓桁安装在云头上端。本发明各个构件之间通过插接即可实现固定连接,从而便于非专业人员的安装和拆卸;拆装的同时不会损坏构件,可使拆卸的构件重复使用,有利于缩短工期,节能环保。
Heteropalace pagoda
一种天后宫戏台斗栱
FENG LI (author) / HU LITING (author) / YANG JIAYING (author)
2023-10-03
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Engineering Index Backfile | 1899
|British Library Online Contents | 2000
|Shaking Table Test on Unreinforced Stone Masonry Pagoda
British Library Conference Proceedings | 2012
|