The invention provides a ground renovation thin pouring process which comprises the following steps: thoroughly sweeping, cleaning and washing a ground to achieve the purpose that the surface of the ground is free of dust, oil stains, foreign matters and the like; after the ground is dried, permeable closed type waterborne epoxy asphalt cement paste primer is brushed once; the wear-resistant carborundum layer can be constructed without waiting for the permeation closed type water-based epoxy asphalt cement paste primer to be completely dried; a light receiving machine is used for carrying out repeated light receiving and compacting operation on the construction area for 3-5 times; after receiving light for 36 hours, spraying a double-unit curing agent on the ground; ground floating ash and particles are ground away through a grinding machine, and a conventional lithium-based concrete curing agent is sprayed 2-5 times; the method has the following beneficial effects that the blank of thin pouring of concrete floor renovation in China is filled up, and the problems that the cost of old concrete floor renovation is too high, the construction period is too long, load bearing is overloaded, the floor height is insufficient, and a huge amount of garbage is generated are solved.
本发明提供一种地面翻新薄浇工艺,包括以下步骤:对地面进行彻底清扫、清理和清洗,达到地面表面无尘、无油污、无异物等问题;待地面干燥后,涂刷一遍渗透封闭型水性环氧沥青水泥浆底漆;无须等待渗透封闭型水性环氧沥青水泥浆底漆干透,即可施工耐磨金刚砂层;使用收光机对施工区域进行3‑5次的反复收光压实操作;收光36小时后,在地面上喷洒双机固化剂;使用研磨机磨除地面浮灰及颗粒,喷洒常规锂基混凝土固化剂2‑5次;经过反复的研磨抛光即可达到施工预期指标,本发明具有如下的有益效果:填补了国内混凝土地面翻新薄浇的空白,解决混凝土老地面翻新成本过大,工期过长,承重过载,层高不足,产生巨量垃圾的问题。
The invention provides a ground renovation thin pouring process which comprises the following steps: thoroughly sweeping, cleaning and washing a ground to achieve the purpose that the surface of the ground is free of dust, oil stains, foreign matters and the like; after the ground is dried, permeable closed type waterborne epoxy asphalt cement paste primer is brushed once; the wear-resistant carborundum layer can be constructed without waiting for the permeation closed type water-based epoxy asphalt cement paste primer to be completely dried; a light receiving machine is used for carrying out repeated light receiving and compacting operation on the construction area for 3-5 times; after receiving light for 36 hours, spraying a double-unit curing agent on the ground; ground floating ash and particles are ground away through a grinding machine, and a conventional lithium-based concrete curing agent is sprayed 2-5 times; the method has the following beneficial effects that the blank of thin pouring of concrete floor renovation in China is filled up, and the problems that the cost of old concrete floor renovation is too high, the construction period is too long, load bearing is overloaded, the floor height is insufficient, and a huge amount of garbage is generated are solved.
本发明提供一种地面翻新薄浇工艺,包括以下步骤:对地面进行彻底清扫、清理和清洗,达到地面表面无尘、无油污、无异物等问题;待地面干燥后,涂刷一遍渗透封闭型水性环氧沥青水泥浆底漆;无须等待渗透封闭型水性环氧沥青水泥浆底漆干透,即可施工耐磨金刚砂层;使用收光机对施工区域进行3‑5次的反复收光压实操作;收光36小时后,在地面上喷洒双机固化剂;使用研磨机磨除地面浮灰及颗粒,喷洒常规锂基混凝土固化剂2‑5次;经过反复的研磨抛光即可达到施工预期指标,本发明具有如下的有益效果:填补了国内混凝土地面翻新薄浇的空白,解决混凝土老地面翻新成本过大,工期过长,承重过载,层高不足,产生巨量垃圾的问题。
Ground renovation thin casting process
一种地面翻新薄浇工艺
XIONG YUTONG (author)
2023-10-10
Patent
Electronic Resource
Chinese
Integrated Renovation Process: Overcoming Barriers to Sustainable Renovation
British Library Online Contents | 2016
|Renovation Process Methodology
Springer Verlag | 2019
|Integrated Renovation Process: Overcoming Barriers to Sustainable Renovation
Online Contents | 2015
|