Large-area carborundum floor construction method
The invention provides a construction method for a large-area carborundum floor. The construction method comprises the following steps that the elevation of the floor is preliminarily calibrated; terrace partitioning is conducted, specifically, the terrace foundation is divided into a first area and a second area with the center line in the width direction of the terrace foundation as the benchmark, the first area is divided into a plurality of first sub-areas, and the second area is divided into a plurality of second sub-areas; treating a floor foundation; the screeding is prepared at the two ends of the first area in the length direction of the first area, between every two adjacent first sub-areas, at the two ends of the second area in the length direction of the second area and between every two adjacent second sub-areas; concrete is poured, specifically, the concrete is poured to all the first sub-areas and all the second sub-areas; leveling by a laser leveling machine; carborundum is spread; performing maintenance; and cutting joints. The large-area carborundum floor construction method can effectively reduce the levelness error.
本申请提出一种大面积金刚砂地坪施工方法,其包括以下步骤:初步校准地坪标高;地坪分区:以地坪基础的宽度方向的中心线为基准,将地坪基础划分为第一区域和第二区域,将第一区域划分为多个第一子区域,将第二区域划分为多个第二子区域;地坪基础处理;制备冲筋:在第一区域沿其长度方向的两端、各相邻两个第一子区域之间、第二区域沿其长度方向的两端、以及各相邻两个第二子区域之间均进行制备冲筋;浇筑混凝土:将混凝土浇筑至各第一子区域以及各第二子区域;激光整平机整平;撒布金刚砂;养护;切缝。本大面积金刚砂地坪施工方法能够有效降低水平度误差。
Large-area carborundum floor construction method
The invention provides a construction method for a large-area carborundum floor. The construction method comprises the following steps that the elevation of the floor is preliminarily calibrated; terrace partitioning is conducted, specifically, the terrace foundation is divided into a first area and a second area with the center line in the width direction of the terrace foundation as the benchmark, the first area is divided into a plurality of first sub-areas, and the second area is divided into a plurality of second sub-areas; treating a floor foundation; the screeding is prepared at the two ends of the first area in the length direction of the first area, between every two adjacent first sub-areas, at the two ends of the second area in the length direction of the second area and between every two adjacent second sub-areas; concrete is poured, specifically, the concrete is poured to all the first sub-areas and all the second sub-areas; leveling by a laser leveling machine; carborundum is spread; performing maintenance; and cutting joints. The large-area carborundum floor construction method can effectively reduce the levelness error.
本申请提出一种大面积金刚砂地坪施工方法,其包括以下步骤:初步校准地坪标高;地坪分区:以地坪基础的宽度方向的中心线为基准,将地坪基础划分为第一区域和第二区域,将第一区域划分为多个第一子区域,将第二区域划分为多个第二子区域;地坪基础处理;制备冲筋:在第一区域沿其长度方向的两端、各相邻两个第一子区域之间、第二区域沿其长度方向的两端、以及各相邻两个第二子区域之间均进行制备冲筋;浇筑混凝土:将混凝土浇筑至各第一子区域以及各第二子区域;激光整平机整平;撒布金刚砂;养护;切缝。本大面积金刚砂地坪施工方法能够有效降低水平度误差。
Large-area carborundum floor construction method
一种大面积金刚砂地坪施工方法
GUAN YONGJIAN (author) / GONG JIE (author) / MA TAO (author) / MO HUIYING (author) / ZHANG YU (author)
2023-10-10
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Large-area carborundum wear-resistant floor troweling equipment
European Patent Office | 2024
|Crack control device for large-area carborundum floor construction and construction method thereof
European Patent Office | 2023
|