Construction method of crawler crane platform
The invention discloses a construction method of a crawler crane platform, the construction method of the crawler crane platform comprises a support installation stage and an operation platform erection stage, the support installation stage comprises the steps of installing a plurality of supports on the ground right above a plurality of support columns according to the condition that the plurality of support columns in a basement are distributed at intervals in the horizontal direction, a support is mounted on the ground right above each support column; and in the operation platform erecting stage, the hoisting platform is installed on at least part of the supports, and the crawler crane can conduct hoisting work on the hoisting platform. The support is installed over the supporting columns in the basement, loads of the support and the hoisting platform are all transmitted to the ground of the basement through the supporting columns of the basement, and therefore under the condition that the basement exists, a crawler crane can be used for conducting construction on a building, and the construction period of the building is greatly shortened.
本发明公开了一种履带吊平台的施工方法,履带吊平台的施工方法包括支座安装阶段和操作平台搭设阶段,支座安装阶段:根据地下室中多个支撑柱沿水平方向间隔分布的情况,在多个支撑柱的正上方的地面上安装多个支座,并使各支撑柱的正上方的地面上均安装有一个支座;操作平台搭设阶段:将吊装平台安装于至少部分支座上,履带吊能够在吊装平台上进行起吊工作。本发明将支座安装在地下室中支撑柱的正上方,在支座以及吊装平台的荷载将通过地下室的支撑柱全部传导至地下室的地面上,那么,在存在地下室的情况下,能够利用履带吊来对楼体进行施工,大大缩短了楼体的施工周期。
Construction method of crawler crane platform
The invention discloses a construction method of a crawler crane platform, the construction method of the crawler crane platform comprises a support installation stage and an operation platform erection stage, the support installation stage comprises the steps of installing a plurality of supports on the ground right above a plurality of support columns according to the condition that the plurality of support columns in a basement are distributed at intervals in the horizontal direction, a support is mounted on the ground right above each support column; and in the operation platform erecting stage, the hoisting platform is installed on at least part of the supports, and the crawler crane can conduct hoisting work on the hoisting platform. The support is installed over the supporting columns in the basement, loads of the support and the hoisting platform are all transmitted to the ground of the basement through the supporting columns of the basement, and therefore under the condition that the basement exists, a crawler crane can be used for conducting construction on a building, and the construction period of the building is greatly shortened.
本发明公开了一种履带吊平台的施工方法,履带吊平台的施工方法包括支座安装阶段和操作平台搭设阶段,支座安装阶段:根据地下室中多个支撑柱沿水平方向间隔分布的情况,在多个支撑柱的正上方的地面上安装多个支座,并使各支撑柱的正上方的地面上均安装有一个支座;操作平台搭设阶段:将吊装平台安装于至少部分支座上,履带吊能够在吊装平台上进行起吊工作。本发明将支座安装在地下室中支撑柱的正上方,在支座以及吊装平台的荷载将通过地下室的支撑柱全部传导至地下室的地面上,那么,在存在地下室的情况下,能够利用履带吊来对楼体进行施工,大大缩短了楼体的施工周期。
Construction method of crawler crane platform
一种履带吊平台的施工方法
RAO JIAYUAN (author) / TAN YUN (author) / SHI YUHAO (author) / ZHANG KAI (author) / ZHANG BIAO (author) / LI HONGBO (author) / GUO JILIANG (author)
2023-10-10
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of trestle based on high-altitude crawler crane
European Patent Office | 2015
|Construction method of composite foundation of large-tonnage crawler crane
European Patent Office | 2020
|