A platform for research: civil engineering, architecture and urbanism
Plugging formwork structure on two sides of post-cast strip of pre-cast floor top plate of super-long building
The invention discloses a plugging template structure for two sides of a post-cast strip of a pre-cast floor top plate of a super-long building, belongs to the technical field of civil construction templates, and solves the problems of how to conveniently and reliably plug the two sides of the post-cast strip and how to improve the quality of combination of the post-cast strip subjected to secondary pouring and floor plate concrete subjected to primary pouring. The flat rubber air bag capable of being inflated and deflated is used for replacing a plugging wood rubber batten below a reinforcing mesh in the plate, plugging of concrete on the two sides of the post-cast strip is achieved, after the concrete on the two sides of the post-cast strip is finally set, the flat rubber air bag is shrunk through deflation and is convenient to take out, and therefore it is guaranteed that subsequent post-cast strip concrete and one-time pouring concrete are reliably combined, and the service life of the post-cast strip is prolonged. And the field operation is convenient.
本发明公开了一种超长建筑物的预浇楼层顶板后浇带两侧的封堵模板结构,属于土建施工模板技术领域,解决了如何便捷地对后浇带两侧可靠封堵,并提升二次浇筑的后浇带与一次浇筑的楼层板混凝土结合的质量问题;用可充放气的扁平橡胶气袋替代板内钢筋网片下的封堵木胶板条,实现了对后浇带两侧混凝土的封堵,当后浇带两侧混凝土终凝后,通过放气,使扁平橡胶气袋缩小,并方便取出,从而保证后续后浇带混凝土与一次浇筑混凝土的可靠结合,并且现场操作便捷。
Plugging formwork structure on two sides of post-cast strip of pre-cast floor top plate of super-long building
The invention discloses a plugging template structure for two sides of a post-cast strip of a pre-cast floor top plate of a super-long building, belongs to the technical field of civil construction templates, and solves the problems of how to conveniently and reliably plug the two sides of the post-cast strip and how to improve the quality of combination of the post-cast strip subjected to secondary pouring and floor plate concrete subjected to primary pouring. The flat rubber air bag capable of being inflated and deflated is used for replacing a plugging wood rubber batten below a reinforcing mesh in the plate, plugging of concrete on the two sides of the post-cast strip is achieved, after the concrete on the two sides of the post-cast strip is finally set, the flat rubber air bag is shrunk through deflation and is convenient to take out, and therefore it is guaranteed that subsequent post-cast strip concrete and one-time pouring concrete are reliably combined, and the service life of the post-cast strip is prolonged. And the field operation is convenient.
本发明公开了一种超长建筑物的预浇楼层顶板后浇带两侧的封堵模板结构,属于土建施工模板技术领域,解决了如何便捷地对后浇带两侧可靠封堵,并提升二次浇筑的后浇带与一次浇筑的楼层板混凝土结合的质量问题;用可充放气的扁平橡胶气袋替代板内钢筋网片下的封堵木胶板条,实现了对后浇带两侧混凝土的封堵,当后浇带两侧混凝土终凝后,通过放气,使扁平橡胶气袋缩小,并方便取出,从而保证后续后浇带混凝土与一次浇筑混凝土的可靠结合,并且现场操作便捷。
Plugging formwork structure on two sides of post-cast strip of pre-cast floor top plate of super-long building
超长建筑物的预浇楼层顶板后浇带两侧的封堵模板结构
LI HONGYAN (author) / XU LINGZHEN (author) / LIU WEI (author) / WANG PENG (author) / ZHAO XIN (author) / JI PANPAN (author) / LI SHAOPENG (author) / GUO WEI (author) / ZHAO YINGYING (author) / ZHAO YUNFAN (author)
2023-10-10
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Floor post-cast strip formwork erecting formwork structure
European Patent Office | 2023
|European Patent Office | 2023
|Construction method of pre-cast floor top plate post-cast strip of super-long building
European Patent Office | 2023
|Basement bottom plate post-cast strip plugging structure
European Patent Office | 2024
|