Construction method of top plate post-cast strip plain concrete column support
The invention discloses a construction method of a top plate post-cast strip plain concrete column support. The construction method is characterized by comprising the following steps: a, drawing a plain concrete column plane layout diagram according to design; b, site cleaning preparation, and plain concrete column paying-off positioning; c, formworks and supporting columns on the two sides of the post-cast strip are reinforced, plain concrete column supports on the two sides of the post-cast strip are erected and reinforced at the same time in the erecting process of the basement structure beam plate formworks, and pouring and curing are conducted at the same time in the pouring process of basement frame column concrete; d, removing the post-cast strip inner template support; and e, concrete pouring is conducted on the basement roof post-cast strip. The construction method for the top plate post-cast strip plain concrete column support has the advantages that it is guaranteed that loads of a basement top plate and a main beam are transmitted to a bottom plate, the top plate and the main beam are prevented from sinking and deforming, steel pipe supporting frame materials at the post-cast strip are effectively turned over, cost is saved, and good applicability is achieved.
一种顶板后浇带素混凝土柱支撑的施工方法,其特征在于包括以下步骤:a、根据设计绘制素混凝土柱平面布置图;b、场地清理准备、素混凝土柱放线定位;c、后浇带两侧模板及支撑柱加固,后浇带两侧素混凝土柱支撑在地下室结构梁板模板搭设过程中同时搭设加固,并在地下室框架柱混凝土浇筑过程中同时浇筑、养护;d、后浇带内模板支撑拆除;e、地下室顶板后浇带混凝土浇筑。本发明的顶板后浇带素混凝土柱支撑的施工方法具有保证地下室顶板及主梁荷载传到底板,防止顶板及主梁下沉变形,使后浇带处钢管支撑架材料得到有效周转,节约成本和良好的适用性的优点。
Construction method of top plate post-cast strip plain concrete column support
The invention discloses a construction method of a top plate post-cast strip plain concrete column support. The construction method is characterized by comprising the following steps: a, drawing a plain concrete column plane layout diagram according to design; b, site cleaning preparation, and plain concrete column paying-off positioning; c, formworks and supporting columns on the two sides of the post-cast strip are reinforced, plain concrete column supports on the two sides of the post-cast strip are erected and reinforced at the same time in the erecting process of the basement structure beam plate formworks, and pouring and curing are conducted at the same time in the pouring process of basement frame column concrete; d, removing the post-cast strip inner template support; and e, concrete pouring is conducted on the basement roof post-cast strip. The construction method for the top plate post-cast strip plain concrete column support has the advantages that it is guaranteed that loads of a basement top plate and a main beam are transmitted to a bottom plate, the top plate and the main beam are prevented from sinking and deforming, steel pipe supporting frame materials at the post-cast strip are effectively turned over, cost is saved, and good applicability is achieved.
一种顶板后浇带素混凝土柱支撑的施工方法,其特征在于包括以下步骤:a、根据设计绘制素混凝土柱平面布置图;b、场地清理准备、素混凝土柱放线定位;c、后浇带两侧模板及支撑柱加固,后浇带两侧素混凝土柱支撑在地下室结构梁板模板搭设过程中同时搭设加固,并在地下室框架柱混凝土浇筑过程中同时浇筑、养护;d、后浇带内模板支撑拆除;e、地下室顶板后浇带混凝土浇筑。本发明的顶板后浇带素混凝土柱支撑的施工方法具有保证地下室顶板及主梁荷载传到底板,防止顶板及主梁下沉变形,使后浇带处钢管支撑架材料得到有效周转,节约成本和良好的适用性的优点。
Construction method of top plate post-cast strip plain concrete column support
一种顶板后浇带素混凝土柱支撑的施工方法
ZHAO PENGFEI (author) / LU BIN (author) / ZHENG YONGDONG (author)
2023-10-10
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
European Patent Office | 2024
|Post-cast strip PVC pipe mold plain concrete independent column supporting method
European Patent Office | 2021
|Concrete constructional column supporting method for top plate post-cast strip
European Patent Office | 2021
|European Patent Office | 2024
|Construction method for settlement post-cast strip supported by reinforced concrete column
European Patent Office | 2022
|