A platform for research: civil engineering, architecture and urbanism
Water conservancy project gate device
The invention discloses a water conservancy project gate device, and relates to the technical field of water conservancy projects, the water conservancy project gate device comprises a dam body, a gate frame is fixed on the dam body, a gate plate is movably connected in the gate frame, a first interception assembly is arranged on the inner side of the dam body, and a second lifting assembly is arranged on the top side of the dam body; a first lifting assembly and a third lifting assembly are arranged on the two sides of the second lifting assembly correspondingly, and a second intercepting assembly is connected to the bottom side of the third lifting assembly. The second lifting assembly comprises a driving box, a motor and a second winding shaft are arranged in the driving box, a second steel wire rope is wound around the second winding shaft, and one end of the second steel wire rope is connected with the top side of the flashboard. The first lifting assembly comprises a winding box, and the interior of the winding box is movably connected with a first winding shaft. According to the device, impurities at the gate can be automatically collected, the height of the collected impurities can be automatically increased, workers can conveniently clean the impurities, the impurity cleaning efficiency is improved, and the impurity cleaning safety is also improved.
本发明公开了一种水利工程闸口装置,涉及水利工程技术领域,一种水利工程闸口装置包括坝体,坝体上固定有闸框,闸框内活动连接有闸板,所述坝体内侧设置有第一拦截组件,坝体顶侧设置有第二提升组件,第二提升组件两侧分别设置有第一提升组件和第三提升组件,第三提升组件底侧连接有第二拦截组件;第二提升组件包括驱动盒,驱动盒内部设置有电机和第二缠绕轴,第二缠绕轴上缠绕有第二钢丝绳,第二钢丝绳一端与闸板顶侧连接;第一提升组件包括卷收盒,卷收盒内部活动连接有第一缠绕轴。本装置可以实现闸口处杂质的自动收集,收集后的杂质可以自动提升高度便于工作人员清理,不仅提高杂质清理的效率,还提高了清理杂质的安全性。
Water conservancy project gate device
The invention discloses a water conservancy project gate device, and relates to the technical field of water conservancy projects, the water conservancy project gate device comprises a dam body, a gate frame is fixed on the dam body, a gate plate is movably connected in the gate frame, a first interception assembly is arranged on the inner side of the dam body, and a second lifting assembly is arranged on the top side of the dam body; a first lifting assembly and a third lifting assembly are arranged on the two sides of the second lifting assembly correspondingly, and a second intercepting assembly is connected to the bottom side of the third lifting assembly. The second lifting assembly comprises a driving box, a motor and a second winding shaft are arranged in the driving box, a second steel wire rope is wound around the second winding shaft, and one end of the second steel wire rope is connected with the top side of the flashboard. The first lifting assembly comprises a winding box, and the interior of the winding box is movably connected with a first winding shaft. According to the device, impurities at the gate can be automatically collected, the height of the collected impurities can be automatically increased, workers can conveniently clean the impurities, the impurity cleaning efficiency is improved, and the impurity cleaning safety is also improved.
本发明公开了一种水利工程闸口装置,涉及水利工程技术领域,一种水利工程闸口装置包括坝体,坝体上固定有闸框,闸框内活动连接有闸板,所述坝体内侧设置有第一拦截组件,坝体顶侧设置有第二提升组件,第二提升组件两侧分别设置有第一提升组件和第三提升组件,第三提升组件底侧连接有第二拦截组件;第二提升组件包括驱动盒,驱动盒内部设置有电机和第二缠绕轴,第二缠绕轴上缠绕有第二钢丝绳,第二钢丝绳一端与闸板顶侧连接;第一提升组件包括卷收盒,卷收盒内部活动连接有第一缠绕轴。本装置可以实现闸口处杂质的自动收集,收集后的杂质可以自动提升高度便于工作人员清理,不仅提高杂质清理的效率,还提高了清理杂质的安全性。
Water conservancy project gate device
一种水利工程闸口装置
LYU NAN (author) / HU YUANCHENG (author) / YU DANDAN (author)
2023-10-13
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Water conservancy gate for water conservancy project design
European Patent Office | 2023
|