Side slope anchor rod structure
The invention discloses a side slope anchor rod structure, which relates to the technical field of anchor rod structures and comprises three control parts which are connected with one another. Through cooperative use of the control part, the pushing part, the pushing and extruding part and the tunneling part, cement paste flows into a space drilled by a soil digging cone of the tunneling part, and meanwhile, the cement paste is poured into the periphery of the connection groove along the leakage hole, so that the control plate is fixed and limited after the cement paste is solidified, and the construction efficiency is improved. Meanwhile, the anchor rod column can be solidified and fixed through cement paste around the connecting groove, in this way, the tensile resistance of the anchor rod structure can be improved, secondary drilling external expansion can be achieved through the designed control component, and therefore the tensile resistance of the anchor rod structure is enhanced again; and the whole tunneling part can be taken out conveniently, so that the tunneling part can be recycled, and the effect of saving materials is achieved.
本发明公开了一种边坡锚杆结构,涉及锚杆结构技术领域,包括三个节制部件,三个所述节制部件互相连接。本发明通过设置的节制部件、推动部件、推挤部件、掘进部件之间的配合使用,使水泥浆流进掘进部件掘土锥钻探的空间内,同时水泥浆顺着漏孔对衔接槽周围进行灌注,从而使水泥浆凝固以后对节制板进行固定限制,同时可依靠衔接槽周围的水泥浆对锚杆柱进行凝固固定,如此可提高该锚杆结构抗拉力,其设计的节制部件可达到二次钻孔外扩,从而再次增强该锚杆结构的抗拉力,其次掘进部件与套孔的配合使用,可使进行钻孔结束以后,便于将掘进部件整体取出,从而使掘进部件可以循环使用,从而达到节约材料的作用。
Side slope anchor rod structure
The invention discloses a side slope anchor rod structure, which relates to the technical field of anchor rod structures and comprises three control parts which are connected with one another. Through cooperative use of the control part, the pushing part, the pushing and extruding part and the tunneling part, cement paste flows into a space drilled by a soil digging cone of the tunneling part, and meanwhile, the cement paste is poured into the periphery of the connection groove along the leakage hole, so that the control plate is fixed and limited after the cement paste is solidified, and the construction efficiency is improved. Meanwhile, the anchor rod column can be solidified and fixed through cement paste around the connecting groove, in this way, the tensile resistance of the anchor rod structure can be improved, secondary drilling external expansion can be achieved through the designed control component, and therefore the tensile resistance of the anchor rod structure is enhanced again; and the whole tunneling part can be taken out conveniently, so that the tunneling part can be recycled, and the effect of saving materials is achieved.
本发明公开了一种边坡锚杆结构,涉及锚杆结构技术领域,包括三个节制部件,三个所述节制部件互相连接。本发明通过设置的节制部件、推动部件、推挤部件、掘进部件之间的配合使用,使水泥浆流进掘进部件掘土锥钻探的空间内,同时水泥浆顺着漏孔对衔接槽周围进行灌注,从而使水泥浆凝固以后对节制板进行固定限制,同时可依靠衔接槽周围的水泥浆对锚杆柱进行凝固固定,如此可提高该锚杆结构抗拉力,其设计的节制部件可达到二次钻孔外扩,从而再次增强该锚杆结构的抗拉力,其次掘进部件与套孔的配合使用,可使进行钻孔结束以后,便于将掘进部件整体取出,从而使掘进部件可以循环使用,从而达到节约材料的作用。
Side slope anchor rod structure
一种边坡锚杆结构
HU GAOJIAN (author) / GUO WENBING (author) / TAN YI (author) / FENG HAORAN (author) / LIANG WENXU (author)
2023-10-13
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Umbrella type side slope anchor rod structure, side slope protection structure and anchoring method
European Patent Office | 2024
|Side slope anchor cable tensioning equipment and side slope repairing process
European Patent Office | 2023
|Side slope anchor cable and side slope anchoring construction method thereof
European Patent Office | 2022
|