Prefabricated wall hoisting method for high-rise concrete structure construction
The invention relates to a high-rise concrete structure prefabricated wall hoisting technology, in particular to a prefabricated wall hoisting method for high-rise concrete structure construction. The truck crane equipment is matched with the anti-deviation assembly and the rigid hooking body to complete quick and deviation-free hoisting work of the prefabricated wall, and the anti-deviation assembly can move downwards through the hanging bracket body before hoisting, so that the pressing and holding body acts on a reserved steel bar exposed at the top of the prefabricated wall to deflect itself; clamping and fixing work on the top of the reserved steel bar is completed after deflection, then rigid hooking and fixing are conducted through a rigid hooking body and a hook embedded in the top of the prefabricated wall body, and rigid hooking and fixing are completed through a locking body, a U-shaped frame, a blocking piece and a hooking groove; and rigid locking and fixing of the lifting hook are completed by the locking body through the blocking piece after the embedded lifting hook completely enters the hooking groove, and deviation-preventing lifting of the prefabricated wall is completed in cooperation with the deviation-preventing assembly.
本发明涉及高层混凝土结构预制墙体吊装技术,具体为一种高层混凝土结构建造用预制墙体吊装方法。通过汽车吊设备配合防偏组件和刚性钩接体完成预制墙体快速且无偏差的吊装工作,防偏组件在吊装前会通过吊架本体的下移,使得压持体作用预制墙体顶部裸漏的预留钢筋使得自身发生偏转,经过偏转后完成对预留钢筋顶部的夹持固定工作,在后经过刚性钩接体和预制墙体顶部预埋吊钩的刚性钩接固定,刚性钩接固定通过锁止体、U形架、挡件和钩接槽来完成,利用挡件对锁止体在预埋吊钩完全进入钩接槽内后完成对吊钩的刚性锁止固定,配合防偏组件完成预制墙体的防偏吊装。
Prefabricated wall hoisting method for high-rise concrete structure construction
The invention relates to a high-rise concrete structure prefabricated wall hoisting technology, in particular to a prefabricated wall hoisting method for high-rise concrete structure construction. The truck crane equipment is matched with the anti-deviation assembly and the rigid hooking body to complete quick and deviation-free hoisting work of the prefabricated wall, and the anti-deviation assembly can move downwards through the hanging bracket body before hoisting, so that the pressing and holding body acts on a reserved steel bar exposed at the top of the prefabricated wall to deflect itself; clamping and fixing work on the top of the reserved steel bar is completed after deflection, then rigid hooking and fixing are conducted through a rigid hooking body and a hook embedded in the top of the prefabricated wall body, and rigid hooking and fixing are completed through a locking body, a U-shaped frame, a blocking piece and a hooking groove; and rigid locking and fixing of the lifting hook are completed by the locking body through the blocking piece after the embedded lifting hook completely enters the hooking groove, and deviation-preventing lifting of the prefabricated wall is completed in cooperation with the deviation-preventing assembly.
本发明涉及高层混凝土结构预制墙体吊装技术,具体为一种高层混凝土结构建造用预制墙体吊装方法。通过汽车吊设备配合防偏组件和刚性钩接体完成预制墙体快速且无偏差的吊装工作,防偏组件在吊装前会通过吊架本体的下移,使得压持体作用预制墙体顶部裸漏的预留钢筋使得自身发生偏转,经过偏转后完成对预留钢筋顶部的夹持固定工作,在后经过刚性钩接体和预制墙体顶部预埋吊钩的刚性钩接固定,刚性钩接固定通过锁止体、U形架、挡件和钩接槽来完成,利用挡件对锁止体在预埋吊钩完全进入钩接槽内后完成对吊钩的刚性锁止固定,配合防偏组件完成预制墙体的防偏吊装。
Prefabricated wall hoisting method for high-rise concrete structure construction
一种高层混凝土结构建造用预制墙体吊装方法
WANG JIA (author) / ZHANG SHI (author) / WANG SHANZHOU (author) / LI BINGKUN (author)
2023-10-20
Patent
Electronic Resource
Chinese
Large prefabricated concrete exterior wall hanging plate hoisting frame and hoisting method
European Patent Office | 2023
|Prefabricated fair-faced concrete grandstand hoisting reverse construction method
European Patent Office | 2023
|