Sidewalk pavement stone paving process
The invention discloses a sidewalk pavement stone paving process, and relates to the field of municipal construction. Comprising the following steps: S1, forming a roadbed layer; s2, a cement concrete cushion layer is laid on the roadbed layer; s3, curbs are installed on one side of the roadbed layer and one side of the cement concrete cushion layer, the other side of the roadbed layer and the other side of the cement concrete cushion layer are walls, the cement concrete cushion layer is obliquely arranged, and the lowest point of the cement concrete cushion layer is close to the curbs; s4, pavement bricks are laid on the cement concrete cushion layer, so that the top surfaces of the pavement bricks are higher than the top surfaces of the curbs; and S5, crack pouring treatment is conducted between every two adjacent sidewalk bricks and stones till the poured cracks are full. By the adoption of the technical scheme, the purpose that rainwater can be effectively drained to the road surface can be achieved.
本申请公开了一种人行道路面石材铺装工艺,涉及市政施工领域。包括以下步骤:S1:形成路基层;S2:在所述路基层上铺设水泥混凝土垫层;S3:将路缘石安装于所述路基层和水泥混凝土垫层的一侧,所述路基层和所述水泥混凝土垫层的另一侧为墙体,所述水泥混凝土垫层倾斜设置,所述水泥混凝土垫层的最低点靠近所述路缘石方向;S4:将人行道砖石铺设于所述水泥混凝土垫层上,使得所述人行道砖石的顶面高于所述路缘石的顶面;S5:相邻两个人行道砖石之间灌缝处理,直至所述灌缝饱满。通过通过采用上述技术方案,从而可以达到雨水能够有效的排泄到路面上的目的。
Sidewalk pavement stone paving process
The invention discloses a sidewalk pavement stone paving process, and relates to the field of municipal construction. Comprising the following steps: S1, forming a roadbed layer; s2, a cement concrete cushion layer is laid on the roadbed layer; s3, curbs are installed on one side of the roadbed layer and one side of the cement concrete cushion layer, the other side of the roadbed layer and the other side of the cement concrete cushion layer are walls, the cement concrete cushion layer is obliquely arranged, and the lowest point of the cement concrete cushion layer is close to the curbs; s4, pavement bricks are laid on the cement concrete cushion layer, so that the top surfaces of the pavement bricks are higher than the top surfaces of the curbs; and S5, crack pouring treatment is conducted between every two adjacent sidewalk bricks and stones till the poured cracks are full. By the adoption of the technical scheme, the purpose that rainwater can be effectively drained to the road surface can be achieved.
本申请公开了一种人行道路面石材铺装工艺,涉及市政施工领域。包括以下步骤:S1:形成路基层;S2:在所述路基层上铺设水泥混凝土垫层;S3:将路缘石安装于所述路基层和水泥混凝土垫层的一侧,所述路基层和所述水泥混凝土垫层的另一侧为墙体,所述水泥混凝土垫层倾斜设置,所述水泥混凝土垫层的最低点靠近所述路缘石方向;S4:将人行道砖石铺设于所述水泥混凝土垫层上,使得所述人行道砖石的顶面高于所述路缘石的顶面;S5:相邻两个人行道砖石之间灌缝处理,直至所述灌缝饱满。通过通过采用上述技术方案,从而可以达到雨水能够有效的排泄到路面上的目的。
Sidewalk pavement stone paving process
一种人行道路面石材铺装工艺
DAI JINZHU (author) / ZHANG LINGYONG (author) / LYU TING (author) / SHI CHENGGANG (author) / FANG XINKANG (author) / WU XUYAN (author)
2023-10-20
Patent
Electronic Resource
Chinese
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Sponge city sidewalk permeable pavement paving unit structure
European Patent Office | 2022
|Engineering Index Backfile | 1907
|Sponge city assembly type sidewalk permeable pavement paving unit structure
European Patent Office | 2023
|