A platform for research: civil engineering, architecture and urbanism
Cast-in-place outer wall construction technology based on insulation board
The invention relates to the field of building construction, in particular to a cast-in-place outer wall construction technology based on an insulation board, which comprises the following steps: S1, binding a reinforcement cage; s2, formwork erecting is conducted, specifically, a formwork is erected on one side of the reinforcement cage; an outer side assembly is built on the other side of the reinforcement cage, the outer side assembly comprises heat preservation plates, and the multiple heat preservation plates are mutually fixed; the outer side assembly and the formwork are fixed; the template and the insulation board form a concrete pouring die cavity; s3, concrete is poured into the concrete pouring mold cavity and maintained, and the next step is carried out after the strength of the concrete reaches the mold removal standard; and S4, the formwork is dismantled, and at the moment, the heat preservation plate and the poured concrete form the outer wall with the heat preservation plate. The method has the effects of shortening the construction period and saving formworks.
本申请涉及一种基于保温板的现浇外墙施工工艺,涉及建筑施工的领域,其包括如下步骤:S1:绑扎钢筋笼;S2:支模:在钢筋笼一侧搭建模板;在钢筋笼另一侧搭建外侧组件,所述外侧组件包括保温板,并将多个保温板相互固定;将外侧组件和模板固定;模板和保温板形成混凝土浇筑模腔;S3:向混凝土浇筑模腔内浇筑混凝土,并养护,待混凝土强度达到拆模标准后,进行下一步骤;S4:拆除模板,此时的保温板与浇筑的混凝土形成带有保温板的外墙。本申请具有缩短施工周期以及节约模板的效果。
Cast-in-place outer wall construction technology based on insulation board
The invention relates to the field of building construction, in particular to a cast-in-place outer wall construction technology based on an insulation board, which comprises the following steps: S1, binding a reinforcement cage; s2, formwork erecting is conducted, specifically, a formwork is erected on one side of the reinforcement cage; an outer side assembly is built on the other side of the reinforcement cage, the outer side assembly comprises heat preservation plates, and the multiple heat preservation plates are mutually fixed; the outer side assembly and the formwork are fixed; the template and the insulation board form a concrete pouring die cavity; s3, concrete is poured into the concrete pouring mold cavity and maintained, and the next step is carried out after the strength of the concrete reaches the mold removal standard; and S4, the formwork is dismantled, and at the moment, the heat preservation plate and the poured concrete form the outer wall with the heat preservation plate. The method has the effects of shortening the construction period and saving formworks.
本申请涉及一种基于保温板的现浇外墙施工工艺,涉及建筑施工的领域,其包括如下步骤:S1:绑扎钢筋笼;S2:支模:在钢筋笼一侧搭建模板;在钢筋笼另一侧搭建外侧组件,所述外侧组件包括保温板,并将多个保温板相互固定;将外侧组件和模板固定;模板和保温板形成混凝土浇筑模腔;S3:向混凝土浇筑模腔内浇筑混凝土,并养护,待混凝土强度达到拆模标准后,进行下一步骤;S4:拆除模板,此时的保温板与浇筑的混凝土形成带有保温板的外墙。本申请具有缩短施工周期以及节约模板的效果。
Cast-in-place outer wall construction technology based on insulation board
一种基于保温板的现浇外墙施工工艺
ZHANG HAILIANG (author) / YANG ZHIMING (author) / QU XINSHENG (author) / CHENG JINGLEI (author) / WANG FANBO (author) / WEN WENZHAO (author) / YANG DONGLEI (author) / FENG XIAOPENG (author) / ZHANG HONGYUN (author) / LIU CHANGJUN (author)
2023-10-20
Patent
Electronic Resource
Chinese
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Cast-in-place outer wall based on insulation board and construction technology
European Patent Office | 2024
|Construction method of full cast-in-place thermal insulation integrated filling outer partition wall
European Patent Office | 2024
|Full cast-in-place concrete outer wall seam drawing construction technology
European Patent Office | 2023
|HA outer formwork cast-in-place concrete composite insulation board
European Patent Office | 2021
|European Patent Office | 2021
|