Prefabricated cavity column construction method
The prefabricated cavity column construction method comprises the following steps that S1, butt joint is conducted, specifically, a prefabricated cavity column is hoisted to a designated place, and the prefabricated cavity column is in butt joint with a base; mounting a supporting rod; the slurry blocking devices are moved to the two sides of the prefabricated cavity column; s2, a slurry blocking stick is inserted into a slurry blocking device; s3, grouting is conducted, specifically, a discharging pipe of a grouting machine is connected with a grout inlet, and grouting is started; s4, slurry blocking; when slurry is discharged from the upper slurry outlet, the slurry blocking device is started, and the slurry blocking device inserts a slurry blocking stick into the lower slurry outlet; the upper slurry outlet is blocked by a worker; s5, curing: standing to cure the slurry; a plurality of slurry outlets below the two surfaces of the prefabricated cavity column can be blocked at the same time, so that the waste of slurry is reduced, and meanwhile, the project progress can be accelerated; and the first motor drives the lower end of the first beating hammer to continuously and repeatedly beat the slurry blocking stick through the first rotating shaft, so that the other end of the slurry blocking stick enters the corresponding slurry outlet through the first fixed through hole.
本发明公开了一种预制空腔柱施工方法,包括以下步骤:S1:对接:将预制空腔柱吊装至指定地点,将预制空腔柱与底座对接;安装支撑杆;并将堵浆装置移动至预制空腔柱的两侧;S2:将堵浆棍插入堵浆装置;S3:灌浆:将灌浆机的出料管与进浆口连接,并开始灌浆;S4:堵浆;待上方的出浆口出浆,开启堵浆装置,堵浆装置将堵浆棍插入下方的出浆口;工人堵上上方的出浆口;S5:固化:静置使浆料固化;可以同时对预制空腔柱的两个面下方的多个出浆口一起进行堵浆,减少浆料的浪费,同时可以增加工程进度;第一电机通过第一转动轴带动第一击打锤的下端不停的对堵浆棍反复的击打,使堵浆棍的另一端通过第一固定通孔进入对应的出浆口中。
Prefabricated cavity column construction method
The prefabricated cavity column construction method comprises the following steps that S1, butt joint is conducted, specifically, a prefabricated cavity column is hoisted to a designated place, and the prefabricated cavity column is in butt joint with a base; mounting a supporting rod; the slurry blocking devices are moved to the two sides of the prefabricated cavity column; s2, a slurry blocking stick is inserted into a slurry blocking device; s3, grouting is conducted, specifically, a discharging pipe of a grouting machine is connected with a grout inlet, and grouting is started; s4, slurry blocking; when slurry is discharged from the upper slurry outlet, the slurry blocking device is started, and the slurry blocking device inserts a slurry blocking stick into the lower slurry outlet; the upper slurry outlet is blocked by a worker; s5, curing: standing to cure the slurry; a plurality of slurry outlets below the two surfaces of the prefabricated cavity column can be blocked at the same time, so that the waste of slurry is reduced, and meanwhile, the project progress can be accelerated; and the first motor drives the lower end of the first beating hammer to continuously and repeatedly beat the slurry blocking stick through the first rotating shaft, so that the other end of the slurry blocking stick enters the corresponding slurry outlet through the first fixed through hole.
本发明公开了一种预制空腔柱施工方法,包括以下步骤:S1:对接:将预制空腔柱吊装至指定地点,将预制空腔柱与底座对接;安装支撑杆;并将堵浆装置移动至预制空腔柱的两侧;S2:将堵浆棍插入堵浆装置;S3:灌浆:将灌浆机的出料管与进浆口连接,并开始灌浆;S4:堵浆;待上方的出浆口出浆,开启堵浆装置,堵浆装置将堵浆棍插入下方的出浆口;工人堵上上方的出浆口;S5:固化:静置使浆料固化;可以同时对预制空腔柱的两个面下方的多个出浆口一起进行堵浆,减少浆料的浪费,同时可以增加工程进度;第一电机通过第一转动轴带动第一击打锤的下端不停的对堵浆棍反复的击打,使堵浆棍的另一端通过第一固定通孔进入对应的出浆口中。
Prefabricated cavity column construction method
一种预制空腔柱施工方法
JIANG HONGQING (author) / XIA QILONG (author) / LIU MIN (author) / KE LINZHI (author) / OUYANG JUNCHI (author) / ZHOU YUJIA (author)
2023-10-20
Patent
Electronic Resource
Chinese
Novel prefabricated cavity column system and construction method
European Patent Office | 2024
|Cavity prefabricated column joint connecting structure and construction method
European Patent Office | 2024
|European Patent Office | 2022
|