Pile foundation positioning construction method
The invention discloses a pile foundation positioning construction method which comprises the steps that two C-shaped corrugated steel pile foundations at the tail end serve as foundations, positioning stay wires are installed on the side edges of the foundations, the two ends of the positioning stay wires are detachably fixed to the side edges of the two C-shaped corrugated steel pile foundations, and the C-shaped corrugated steel pile foundation in the middle is pre-embedded into a pile hole where concrete is poured by taking the positioning stay wires as a positioning reference; and adjusting to be vertical by combining a gradienter to present a pile foundation positioning distribution system. The two ends of the positioning stay wire are detachably fixed to the two C-shaped corrugated steel pile foundations located at the tail ends, and when the C-shaped corrugated steel pile foundation in the middle is embedded into a pile hole where concrete is poured by taking the positioning stay wire as a positioning reference, the positioning stay wire does not occupy too much site construction space; the problem that the construction environment space is occupied when the positioning rods are located at the two ends of the pile foundation is solved.
本发明公开了一种桩基础定位施工方法,包括:以末端两个的C楞钢桩基础为基础在其侧边安装定位拉线,定位拉线两端可拆卸固定在两个C楞钢桩基础侧边上,中部的C楞钢桩基础依靠定位拉线作为定位基准预埋入已倒入混凝土的桩孔中,结合水平仪调整至垂直,呈现桩基础定位分布体系。定位拉线两端可拆卸固定在处于末端的两个C楞钢桩基础上,在中部的C楞钢桩基础依靠定位拉线作为定位基准预埋入已倒入混凝土的桩孔中时,定位拉线不会过多占用现场施工空间,解决了定位杆处在桩基础两端上会占用施工环境空间的问题。
Pile foundation positioning construction method
The invention discloses a pile foundation positioning construction method which comprises the steps that two C-shaped corrugated steel pile foundations at the tail end serve as foundations, positioning stay wires are installed on the side edges of the foundations, the two ends of the positioning stay wires are detachably fixed to the side edges of the two C-shaped corrugated steel pile foundations, and the C-shaped corrugated steel pile foundation in the middle is pre-embedded into a pile hole where concrete is poured by taking the positioning stay wires as a positioning reference; and adjusting to be vertical by combining a gradienter to present a pile foundation positioning distribution system. The two ends of the positioning stay wire are detachably fixed to the two C-shaped corrugated steel pile foundations located at the tail ends, and when the C-shaped corrugated steel pile foundation in the middle is embedded into a pile hole where concrete is poured by taking the positioning stay wire as a positioning reference, the positioning stay wire does not occupy too much site construction space; the problem that the construction environment space is occupied when the positioning rods are located at the two ends of the pile foundation is solved.
本发明公开了一种桩基础定位施工方法,包括:以末端两个的C楞钢桩基础为基础在其侧边安装定位拉线,定位拉线两端可拆卸固定在两个C楞钢桩基础侧边上,中部的C楞钢桩基础依靠定位拉线作为定位基准预埋入已倒入混凝土的桩孔中,结合水平仪调整至垂直,呈现桩基础定位分布体系。定位拉线两端可拆卸固定在处于末端的两个C楞钢桩基础上,在中部的C楞钢桩基础依靠定位拉线作为定位基准预埋入已倒入混凝土的桩孔中时,定位拉线不会过多占用现场施工空间,解决了定位杆处在桩基础两端上会占用施工环境空间的问题。
Pile foundation positioning construction method
一种桩基础定位施工方法
ZOU YANG (author) / LU HAI (author) / LI RONG (author) / SUN YAFENG (author)
2023-10-24
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2022
|European Patent Office | 2015
|Pile foundation reinforcement cage construction positioning method
European Patent Office | 2021
|