Frame body for waterproof operation in pipeline and construction method of frame body
The invention provides a frame body for waterproof operation in a pipeline and a construction method of the frame body, the frame body comprises at least two main rods, at least four side rods and at least two cross rods, the side rods are distributed on the two sides of the main rods, the middle part of each cross rod is fixedly connected with one main rod, and the two end parts of each cross rod are fixedly connected with one side rod respectively; the frame body further comprises a top platform; the lower ends of the side rods are higher than the lower end of the main rod; the lower end of the side rod comprises a first adjustable assembly, and the first adjustable assembly is used for making the side rod make contact with or be separated from the inner wall of the pipeline. The frame body for the waterproof operation in the pipeline is used for solving the problems that a herringbone ladder is adopted for the waterproof operation in the pipeline at present, the operation difficulty is large, the operation is not safe, the operation height requirement cannot be met, the construction technology is complex, and the consumed time is long.
本申请提供一种用于管道内防水作业的架体及其施工方法,包括:至少两个主杆,至少四个侧杆、至少两个横杆,所述侧杆分布于主杆两侧,每一个横杆的中部与一个主杆固定连接,两端部分别与一个侧杆固定连接;所述架体还包括顶部平台;所述侧杆下端的高度高于所述主杆下端的高度;所述侧杆的下端包括第一可调节组件,所述第一可调节组件用于使所述侧杆与管道的内壁接触或分离。本申请提供的一种用于管道内防水作业的架体,用以解决目前管道内防水作业采用人字梯作业难度大,不安全,不能满足操作高度要求,施工工艺复杂,用时长的问题。
Frame body for waterproof operation in pipeline and construction method of frame body
The invention provides a frame body for waterproof operation in a pipeline and a construction method of the frame body, the frame body comprises at least two main rods, at least four side rods and at least two cross rods, the side rods are distributed on the two sides of the main rods, the middle part of each cross rod is fixedly connected with one main rod, and the two end parts of each cross rod are fixedly connected with one side rod respectively; the frame body further comprises a top platform; the lower ends of the side rods are higher than the lower end of the main rod; the lower end of the side rod comprises a first adjustable assembly, and the first adjustable assembly is used for making the side rod make contact with or be separated from the inner wall of the pipeline. The frame body for the waterproof operation in the pipeline is used for solving the problems that a herringbone ladder is adopted for the waterproof operation in the pipeline at present, the operation difficulty is large, the operation is not safe, the operation height requirement cannot be met, the construction technology is complex, and the consumed time is long.
本申请提供一种用于管道内防水作业的架体及其施工方法,包括:至少两个主杆,至少四个侧杆、至少两个横杆,所述侧杆分布于主杆两侧,每一个横杆的中部与一个主杆固定连接,两端部分别与一个侧杆固定连接;所述架体还包括顶部平台;所述侧杆下端的高度高于所述主杆下端的高度;所述侧杆的下端包括第一可调节组件,所述第一可调节组件用于使所述侧杆与管道的内壁接触或分离。本申请提供的一种用于管道内防水作业的架体,用以解决目前管道内防水作业采用人字梯作业难度大,不安全,不能满足操作高度要求,施工工艺复杂,用时长的问题。
Frame body for waterproof operation in pipeline and construction method of frame body
一种用于管道内防水作业的架体及其施工方法
HU PENGBO (author) / DING MINGCHANG (author) / ZHAO ZEYU (author) / LI JIN (author) / ZHANG WENMING (author) / ZHANG JUN (author) / ZHAO YANFEI (author)
2023-10-24
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
WATERPROOF DOOR FRAME, AND CONSTRUCTION METHOD OF WATERPROOF DOOR FRAME
European Patent Office | 2022
|WATERPROOF DOOR FRAME, AND CONSTRUCTION METHOD OF WATERPROOF DOOR FRAME
European Patent Office | 2022
|WATERPROOF DOOR FRAME, AND CONSTRUCTION METHOD OF WATERPROOF DOOR FRAME
European Patent Office | 2022
|