Method for quickly mounting and dismounting bailey beam truss
The invention relates to the technical field of building construction, in particular to a quick mounting and dismounting method for a bailey beam truss. The method comprises the following steps: S1, performing construction early-stage preparation according to a construction scheme passing review; s2, foundation treatment is conducted on a site where the Bailey beam truss mounting and dismounting procedures are located; s3, building a supporting system; s4, performing a support pre-pressing test on the support system; box girder construction is carried out after the pre-pressing test is passed; s5, after construction of the box girder is finished, grouting strength testing is conducted; s6, after the grouting strength test is passed, a supporting system dismantling procedure is started; and S7, after the supporting system dismantling procedure is finished, river channel cleaning and slope repairing are conducted in sequence. Through the method, the bailey beam truss can be quickly mounted and dismounted, the construction difficulty is reduced, the engineering time is saved, and the engineering efficiency is improved.
本发明涉及建筑施工技术领域,尤其涉及一种贝雷梁桁架的快速安装和拆卸的方法。所述方法包括以下步骤:S1、依据评审通过的所述施工方案进行施工前期准备;S2、对贝雷梁桁架的安装和拆卸工序所在的场地进行地基基础处理;S3、搭建支撑体系;S4、在所述支撑体系上进行支架预压试验;所述预压试验通过后进行箱梁施工;S5、所述箱梁施工结束后,进行压浆强度测试;S6、所述压浆强度测试通过后开启支撑体系拆除工序;S7、所述支撑体系拆除工序结束后,依次进行河道清理,边坡修复。通过该方法能够对贝雷梁桁架进行快速的安装和拆卸,降低了施工难度,节省了工程时间,提升了工程效率。
Method for quickly mounting and dismounting bailey beam truss
The invention relates to the technical field of building construction, in particular to a quick mounting and dismounting method for a bailey beam truss. The method comprises the following steps: S1, performing construction early-stage preparation according to a construction scheme passing review; s2, foundation treatment is conducted on a site where the Bailey beam truss mounting and dismounting procedures are located; s3, building a supporting system; s4, performing a support pre-pressing test on the support system; box girder construction is carried out after the pre-pressing test is passed; s5, after construction of the box girder is finished, grouting strength testing is conducted; s6, after the grouting strength test is passed, a supporting system dismantling procedure is started; and S7, after the supporting system dismantling procedure is finished, river channel cleaning and slope repairing are conducted in sequence. Through the method, the bailey beam truss can be quickly mounted and dismounted, the construction difficulty is reduced, the engineering time is saved, and the engineering efficiency is improved.
本发明涉及建筑施工技术领域,尤其涉及一种贝雷梁桁架的快速安装和拆卸的方法。所述方法包括以下步骤:S1、依据评审通过的所述施工方案进行施工前期准备;S2、对贝雷梁桁架的安装和拆卸工序所在的场地进行地基基础处理;S3、搭建支撑体系;S4、在所述支撑体系上进行支架预压试验;所述预压试验通过后进行箱梁施工;S5、所述箱梁施工结束后,进行压浆强度测试;S6、所述压浆强度测试通过后开启支撑体系拆除工序;S7、所述支撑体系拆除工序结束后,依次进行河道清理,边坡修复。通过该方法能够对贝雷梁桁架进行快速的安装和拆卸,降低了施工难度,节省了工程时间,提升了工程效率。
Method for quickly mounting and dismounting bailey beam truss
一种贝雷梁桁架的快速安装和拆卸的方法
HUANG DONGHAI (author) / ZHOU QI (author) / LI YUNQI (author) / LAI SHIGUANG (author) / LIU TAO (author) / HAO XIAOMIN (author) / HUANG XIANG (author) / BAO FANGWEI (author) / JIANG WEI (author) / JIN XIN (author)
2023-10-27
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
River-crossing bailey beam support and dismounting and mounting method thereof
European Patent Office | 2021
|Bailey beam support system dismounting and moving construction method
European Patent Office | 2024
|Construction method for quickly mounting and dismounting temporary support of continuous beam pier
European Patent Office | 2024
|Cast-in-place bridge bailey support dismounting equipment and dismounting method
European Patent Office | 2021
|