Fixing device of leachate lifting inclined pipe and construction method of fixing device
The invention discloses a fixing device of a percolate lifting inclined pipe and a construction method of the fixing device, and relates to the technical field of pipeline fixing.The fixing device comprises a flange piece, a hoop and two traction devices, the flange piece is fixedly arranged at the first tail end of the percolate lifting inclined pipe, the hoop is arranged on the percolate lifting inclined pipe in a sleeving mode, and the two traction devices are arranged at the second tail end of the percolate lifting inclined pipe; the hoop is arranged on the flange piece and located on the side, away from the first tail end, of the flange piece, bolts are arranged on the two sides of the hoop, the two first ends, on the same side, of the two traction devices are detachably connected to an anchoring platform of the garbage dam, and the two second ends, on the same side, of the two traction devices are detachably connected with the two sides of the hoop correspondingly. According to the device, the inclined section of the leachate lifting inclined pipe can be prevented from sliding and deforming on the side slope, and according to the construction method, the construction efficiency is improved and the repeated adjustment process of construction is reduced through the process of fixing firstly and then tensioning.
本发明公开一种渗滤液提升斜管的固定装置及其施工方法,该发明涉及管道固定技术领域,包括:法兰件,抱箍和两个牵引装置,法兰件固定设于渗滤液提升斜管的第一末端,抱箍套设于渗滤液提升斜管上,且位于法兰件的远离第一末端的一侧,抱箍的两侧均设有螺栓,两个牵引装置同一侧的两个第一端可拆卸连接于垃圾坝的锚固平台上,两个牵引装置的同一侧的两个第二端分别与抱箍的两侧可拆卸连接,该装置能够防止渗滤液提升斜管的倾斜段在边坡上滑移动和变形,该施工方法通过先固定,后拉紧的流程,提高了施工效率,减少了施工的反复调整过程。
Fixing device of leachate lifting inclined pipe and construction method of fixing device
The invention discloses a fixing device of a percolate lifting inclined pipe and a construction method of the fixing device, and relates to the technical field of pipeline fixing.The fixing device comprises a flange piece, a hoop and two traction devices, the flange piece is fixedly arranged at the first tail end of the percolate lifting inclined pipe, the hoop is arranged on the percolate lifting inclined pipe in a sleeving mode, and the two traction devices are arranged at the second tail end of the percolate lifting inclined pipe; the hoop is arranged on the flange piece and located on the side, away from the first tail end, of the flange piece, bolts are arranged on the two sides of the hoop, the two first ends, on the same side, of the two traction devices are detachably connected to an anchoring platform of the garbage dam, and the two second ends, on the same side, of the two traction devices are detachably connected with the two sides of the hoop correspondingly. According to the device, the inclined section of the leachate lifting inclined pipe can be prevented from sliding and deforming on the side slope, and according to the construction method, the construction efficiency is improved and the repeated adjustment process of construction is reduced through the process of fixing firstly and then tensioning.
本发明公开一种渗滤液提升斜管的固定装置及其施工方法,该发明涉及管道固定技术领域,包括:法兰件,抱箍和两个牵引装置,法兰件固定设于渗滤液提升斜管的第一末端,抱箍套设于渗滤液提升斜管上,且位于法兰件的远离第一末端的一侧,抱箍的两侧均设有螺栓,两个牵引装置同一侧的两个第一端可拆卸连接于垃圾坝的锚固平台上,两个牵引装置的同一侧的两个第二端分别与抱箍的两侧可拆卸连接,该装置能够防止渗滤液提升斜管的倾斜段在边坡上滑移动和变形,该施工方法通过先固定,后拉紧的流程,提高了施工效率,减少了施工的反复调整过程。
Fixing device of leachate lifting inclined pipe and construction method of fixing device
一种渗滤液提升斜管的固定装置及其施工方法