A platform for research: civil engineering, architecture and urbanism
Prefabricated steel reinforced concrete column and composite structure
The invention relates to the technical field of prefabricated building components, solves the problem that in the prior art, a concrete prefabricated column is inconvenient to install, and discloses a prefabricated steel reinforced concrete column and a combined structure. The prefabricated steel reinforced concrete column comprises a fixed section and a combined section, and the end, close to the ground, of the combined section is slidably connected with a first mold sleeve; the end, away from the ground, of the fixed section is slidably connected with a second mold sleeve, a pouring hole is formed in the second mold sleeve, a grout overflow hole is formed in the first mold sleeve, the first mold sleeve and the second mold sleeve are each formed by enclosing a plurality of side plates in an end-to-end mode, and the side plates are detachably connected with one another. The first die sleeve and the second die sleeve are detachably connected through a fixing piece after abutting against each other. The first mold sleeve and the second mold sleeve can slide to abut against each other to form the pouring space so as to fill concrete, so that a structure convenient for forming the pouring space is provided, the mold setting efficiency is improved, and the prefabricated column mounting efficiency is improved.
本申请涉及预制建筑构件的技术领域,改善了现有技术混凝土预制柱进行安装不便的问题,公开了一种预制型钢混凝土柱及组合结构,其包括固定段和组合段,组合段靠近地面的一端滑动连接有第一模具套,固定段远离地面的一端滑动连接有第二模具套,第二模具套开设有浇筑孔,第一模具套开设有溢浆孔,第一模具套与第二模具套均由若干侧板首尾相接围合而成,若干侧板相互可拆卸连接,第一模具套与第二模具套相抵接后通过固定件可拆卸连接。本申请能够通过滑动第一模具套与第二模具套至相互抵接,形成浇筑空间,以加注混凝土,从而提供一种便于形成浇筑空间的结构,以此增加模具设置的效率,增加预制柱安装效率。
Prefabricated steel reinforced concrete column and composite structure
The invention relates to the technical field of prefabricated building components, solves the problem that in the prior art, a concrete prefabricated column is inconvenient to install, and discloses a prefabricated steel reinforced concrete column and a combined structure. The prefabricated steel reinforced concrete column comprises a fixed section and a combined section, and the end, close to the ground, of the combined section is slidably connected with a first mold sleeve; the end, away from the ground, of the fixed section is slidably connected with a second mold sleeve, a pouring hole is formed in the second mold sleeve, a grout overflow hole is formed in the first mold sleeve, the first mold sleeve and the second mold sleeve are each formed by enclosing a plurality of side plates in an end-to-end mode, and the side plates are detachably connected with one another. The first die sleeve and the second die sleeve are detachably connected through a fixing piece after abutting against each other. The first mold sleeve and the second mold sleeve can slide to abut against each other to form the pouring space so as to fill concrete, so that a structure convenient for forming the pouring space is provided, the mold setting efficiency is improved, and the prefabricated column mounting efficiency is improved.
本申请涉及预制建筑构件的技术领域,改善了现有技术混凝土预制柱进行安装不便的问题,公开了一种预制型钢混凝土柱及组合结构,其包括固定段和组合段,组合段靠近地面的一端滑动连接有第一模具套,固定段远离地面的一端滑动连接有第二模具套,第二模具套开设有浇筑孔,第一模具套开设有溢浆孔,第一模具套与第二模具套均由若干侧板首尾相接围合而成,若干侧板相互可拆卸连接,第一模具套与第二模具套相抵接后通过固定件可拆卸连接。本申请能够通过滑动第一模具套与第二模具套至相互抵接,形成浇筑空间,以加注混凝土,从而提供一种便于形成浇筑空间的结构,以此增加模具设置的效率,增加预制柱安装效率。
Prefabricated steel reinforced concrete column and composite structure
一种预制型钢混凝土柱及组合结构
YU GUANGTAO (author) / CHEN GUANGYUAN (author) / XU LIANGBING (author) / CHENG YIFU (author) / SHA GUILIN (author) / WANG YISHAN (author) / ZHOU QIWEI (author) / HUANG HAITAO (author) / WANG HAOBO (author)
2023-10-31
Patent
Electronic Resource
Chinese
Steel reinforced concrete prefabricated column node connecting structure
European Patent Office | 2023
|Prefabricated steel reinforced concrete column and connecting joint structure
European Patent Office | 2024
|PREFABRICATED PIER COLUMN MEMBER WITH STEEL-CONCRETE COMPOSITE STRUCTURE
European Patent Office | 2019