Constructional column construction method for concrete flush top plate
A constructional column construction method for a concrete flush top plate is characterized in that a box formwork with two open ends is manufactured, constructional column pouring holes can be formed in an upper floor under the action of the box formwork during pouring construction of the upper floor, and formwork notches are formed in the box formwork so that floor reinforcing bars can be exposed in the pouring holes; therefore, the upper end of the constructional column can be hung on the floor reinforcing bar, a connection relation is established between the constructional column and the floor reinforcing bar, stability of the column reinforcing bar is guaranteed, and after concrete is poured from the constructional column pouring hole, the concrete can integrally pour the floor reinforcing bar and the column reinforcing bar to form the constructional column which is integrated with the floor. The problems that a traditional construction mode is narrow in operation space and inconvenient to construct, and the upper end of the constructional column cannot be closed with a floor are well solved, and the supporting strength of the constructional column serving as a framework is greatly improved.
一种混凝土平齐顶板的构造柱施工方法,该施工方法制作了两端开口的箱体模板,上层楼面浇筑施工时在箱体模板的作用下,上层楼面内能够形成构造柱浇筑孔,并在箱体模板上设置模板缺口使楼面配筋裸露在浇筑孔内,因此构造柱上端能够挂接在楼面配筋上,在两者之间建立连接关系,保证柱配筋的稳固,从构造柱浇筑孔浇入混凝土之后,混凝土能够将楼面配筋和柱配筋一体浇筑形成构造柱,与楼面形成一体,很好的解决了传统施工方式操作空间狭窄、施工不便,以及构造柱上端无法与楼面闭合的问题,大幅度提高了构造柱作为骨架的支撑强度。
Constructional column construction method for concrete flush top plate
A constructional column construction method for a concrete flush top plate is characterized in that a box formwork with two open ends is manufactured, constructional column pouring holes can be formed in an upper floor under the action of the box formwork during pouring construction of the upper floor, and formwork notches are formed in the box formwork so that floor reinforcing bars can be exposed in the pouring holes; therefore, the upper end of the constructional column can be hung on the floor reinforcing bar, a connection relation is established between the constructional column and the floor reinforcing bar, stability of the column reinforcing bar is guaranteed, and after concrete is poured from the constructional column pouring hole, the concrete can integrally pour the floor reinforcing bar and the column reinforcing bar to form the constructional column which is integrated with the floor. The problems that a traditional construction mode is narrow in operation space and inconvenient to construct, and the upper end of the constructional column cannot be closed with a floor are well solved, and the supporting strength of the constructional column serving as a framework is greatly improved.
一种混凝土平齐顶板的构造柱施工方法,该施工方法制作了两端开口的箱体模板,上层楼面浇筑施工时在箱体模板的作用下,上层楼面内能够形成构造柱浇筑孔,并在箱体模板上设置模板缺口使楼面配筋裸露在浇筑孔内,因此构造柱上端能够挂接在楼面配筋上,在两者之间建立连接关系,保证柱配筋的稳固,从构造柱浇筑孔浇入混凝土之后,混凝土能够将楼面配筋和柱配筋一体浇筑形成构造柱,与楼面形成一体,很好的解决了传统施工方式操作空间狭窄、施工不便,以及构造柱上端无法与楼面闭合的问题,大幅度提高了构造柱作为骨架的支撑强度。
Constructional column construction method for concrete flush top plate
混凝土平齐顶板的构造柱施工方法
LIU JIANPING (author) / ZHOU ZHIJUN (author) / JIN HONGWEI (author) / NIU XIAOYAN (author) / ZHANG QI (author) / LI YUAN (author) / YAN JIAHAO (author) / LI SHUAIPENG (author) / PAN LINGSHENG (author) / JIN XIAOYING (author)
2023-11-03
Patent
Electronic Resource
Chinese
Constructional column with concrete flush top plate and construction method of constructional column
European Patent Office | 2024
|European Patent Office | 2021
|Constructional column construction method and constructional column mold
European Patent Office | 2021
|European Patent Office | 2024
|Constructional column concrete pouring robot and constructional column pouring method
European Patent Office | 2023
|