A platform for research: civil engineering, architecture and urbanism
Prefabricated foundation for fabricated building and construction method thereof
The invention relates to the technical field of constructional engineering, and particularly discloses a prefabricated foundation for a fabricated building and a construction method thereof.The prefabricated foundation comprises a vertical force transmission type prefabricated part and a prefabricated beam, first connecting pieces are fixed to the two ends of the prefabricated beam, a post-pouring area is arranged on the vertical force transmission type prefabricated part, and a lateral opening is formed in the post-pouring area; a side opening of the post-pouring area can directly face the side end face of the precast beam, the post-pouring area is used for grouting after the vertical force transmission type prefabricated part is connected with the precast beam, a second connecting piece is fixed to the vertical force transmission type prefabricated part, and the second connecting piece can be connected with the first connecting piece; the second connecting piece and the first connecting piece are located in the post-pouring area after being connected. According to the scheme, the problems that in the prior art, a traditional concrete cast-in-place foundation is long in construction time, high in cost and large in environmental pollution, and an existing prefabricated foundation is high in manufacturing cost, poor in construction feasibility and insufficient in safety are solved.
本发明涉及建筑工程技术领域,具体公开了装配式建筑用预制基础及其施工方法,包括竖向传力类预制构件和预制梁,预制梁的两端均固定有第一连接件,竖向传力类预制构件上设有后浇区域,后浇区域具有侧向开口,后浇区域的侧向开口能够正对预制梁的侧端面,后浇区域用于在竖向传力类预制构件与预制梁连接后进行灌浆,竖向传力类预制构件上固定有第二连接件,第二连接件和第一连接件能够连接,第二连接件和第一连接件连接后均位于后浇区域内。本方案用以解决现有技术中传统的混凝土现浇基础存在的施工时间长、成本高、环境污染大的问题而现有的预制基础又存在造价高、施工可行性差及安全性不足的问题。
Prefabricated foundation for fabricated building and construction method thereof
The invention relates to the technical field of constructional engineering, and particularly discloses a prefabricated foundation for a fabricated building and a construction method thereof.The prefabricated foundation comprises a vertical force transmission type prefabricated part and a prefabricated beam, first connecting pieces are fixed to the two ends of the prefabricated beam, a post-pouring area is arranged on the vertical force transmission type prefabricated part, and a lateral opening is formed in the post-pouring area; a side opening of the post-pouring area can directly face the side end face of the precast beam, the post-pouring area is used for grouting after the vertical force transmission type prefabricated part is connected with the precast beam, a second connecting piece is fixed to the vertical force transmission type prefabricated part, and the second connecting piece can be connected with the first connecting piece; the second connecting piece and the first connecting piece are located in the post-pouring area after being connected. According to the scheme, the problems that in the prior art, a traditional concrete cast-in-place foundation is long in construction time, high in cost and large in environmental pollution, and an existing prefabricated foundation is high in manufacturing cost, poor in construction feasibility and insufficient in safety are solved.
本发明涉及建筑工程技术领域,具体公开了装配式建筑用预制基础及其施工方法,包括竖向传力类预制构件和预制梁,预制梁的两端均固定有第一连接件,竖向传力类预制构件上设有后浇区域,后浇区域具有侧向开口,后浇区域的侧向开口能够正对预制梁的侧端面,后浇区域用于在竖向传力类预制构件与预制梁连接后进行灌浆,竖向传力类预制构件上固定有第二连接件,第二连接件和第一连接件能够连接,第二连接件和第一连接件连接后均位于后浇区域内。本方案用以解决现有技术中传统的混凝土现浇基础存在的施工时间长、成本高、环境污染大的问题而现有的预制基础又存在造价高、施工可行性差及安全性不足的问题。
Prefabricated foundation for fabricated building and construction method thereof
装配式建筑用预制基础及其施工方法
DU HE (author) / ZHENG JUN (author) / YANG XIUCHUAN (author) / TENG YUE (author) / JIANG KAIXUAN (author) / TAN HUIWEN (author) / DENG YAN (author) / CHEN BOCHUN (author)
2023-11-07
Patent
Electronic Resource
Chinese
Fabricated prefabricated foundation and construction method thereof
European Patent Office | 2022
|Fabricated building with prefabricated fabricated foundation
European Patent Office | 2022
|Fabricated building with prefabricated fabricated foundation
European Patent Office | 2023
|Fabricated building with prefabricated fabricated foundation and assembling method thereof
European Patent Office | 2021
|European Patent Office | 2022
|