A platform for research: civil engineering, architecture and urbanism
Fabricated formwork of cast-in-place rainwater inspection well and construction method of fabricated formwork
The invention discloses a fabricated formwork of a cast-in-place rainwater inspection well and a construction method of the fabricated formwork, and relates to the technical field of drainage engineering. Comprising a plastic formwork, an assembling cavity is formed in the surface of the plastic formwork, a plurality of supporting rib plates are fixedly installed on the edge of the interior of the assembling cavity, transverse rib plates and vertical rib plates are arranged in the assembling cavity in a crossed mode, the two ends of the transverse rib plates and the two ends of the vertical rib plates are fixedly connected with the supporting rib plates, and inclined rib plates are fixedly arranged in the assembling cavity; the assembling cavity is composed of two first side plate faces and second side plate faces, a plurality of assembling holes are formed in the two second side plate faces in a penetrating mode, lock pins are clamped in the assembling holes, the two plastic formworks are assembled and connected in the mode that the lock pins are inserted into the assembling holes, and main plate faces are arranged on the faces, away from the assembling cavity, of the plastic formworks; due to the material characteristic of the plastic formwork, the plastic formwork is very convenient to transfer, the construction efficiency is greatly improved, in the construction process of the rainwater inspection well, the plastic formwork replaces a steel formwork, noise pollution can be reduced, and the urban environment is facilitated.
本发明公开了一种现浇雨水检查井的装配式模板及其施工方法,涉及排水工程技术领域。包括塑料模板,塑料模板表面开设有装配腔,装配腔内部边缘处固定安装有若干支撑肋板,装配腔内部设置有横肋板和竖肋板,横肋板与竖肋板交叉设置,横肋板与竖肋板的两端均固定连接支撑肋板,装配腔内部固设有斜肋板,装配腔由两个第一侧板面与第二侧板面组成,两个第二侧板面贯穿开设有若干装配孔,装配孔内部卡接有锁销,两个塑料模板通过锁销插接装配孔装配连接,塑料模板远离装配腔的一面设置有主板面,由塑料模板的材质特性使得其周转时异常便捷,极大的提高施工效率,在雨水检查井的施工过程中,塑料模代替钢模使用,能降低噪音污染,有利于城市环境。
Fabricated formwork of cast-in-place rainwater inspection well and construction method of fabricated formwork
The invention discloses a fabricated formwork of a cast-in-place rainwater inspection well and a construction method of the fabricated formwork, and relates to the technical field of drainage engineering. Comprising a plastic formwork, an assembling cavity is formed in the surface of the plastic formwork, a plurality of supporting rib plates are fixedly installed on the edge of the interior of the assembling cavity, transverse rib plates and vertical rib plates are arranged in the assembling cavity in a crossed mode, the two ends of the transverse rib plates and the two ends of the vertical rib plates are fixedly connected with the supporting rib plates, and inclined rib plates are fixedly arranged in the assembling cavity; the assembling cavity is composed of two first side plate faces and second side plate faces, a plurality of assembling holes are formed in the two second side plate faces in a penetrating mode, lock pins are clamped in the assembling holes, the two plastic formworks are assembled and connected in the mode that the lock pins are inserted into the assembling holes, and main plate faces are arranged on the faces, away from the assembling cavity, of the plastic formworks; due to the material characteristic of the plastic formwork, the plastic formwork is very convenient to transfer, the construction efficiency is greatly improved, in the construction process of the rainwater inspection well, the plastic formwork replaces a steel formwork, noise pollution can be reduced, and the urban environment is facilitated.
本发明公开了一种现浇雨水检查井的装配式模板及其施工方法,涉及排水工程技术领域。包括塑料模板,塑料模板表面开设有装配腔,装配腔内部边缘处固定安装有若干支撑肋板,装配腔内部设置有横肋板和竖肋板,横肋板与竖肋板交叉设置,横肋板与竖肋板的两端均固定连接支撑肋板,装配腔内部固设有斜肋板,装配腔由两个第一侧板面与第二侧板面组成,两个第二侧板面贯穿开设有若干装配孔,装配孔内部卡接有锁销,两个塑料模板通过锁销插接装配孔装配连接,塑料模板远离装配腔的一面设置有主板面,由塑料模板的材质特性使得其周转时异常便捷,极大的提高施工效率,在雨水检查井的施工过程中,塑料模代替钢模使用,能降低噪音污染,有利于城市环境。
Fabricated formwork of cast-in-place rainwater inspection well and construction method of fabricated formwork
一种现浇雨水检查井的装配式模板及其施工方法
ZHENG RUIMING (author) / LI ERHAN (author) / YE BAOQUAN (author) / QIAN JIAQIN (author) / ZHANG PENG (author) / BA XIAOXUAN (author) / BAO YANFEI (author) / SHI WEI (author) / YANG JIANCHUN (author)
2023-11-07
Patent
Electronic Resource
Chinese
IPC:
E03F
SEWERS
,
Abwasserkanäle
Fabricated construction formwork for fabricated building
European Patent Office | 2023
|Fabricated laminated slab cast-in-place belt hanging formwork construction device
European Patent Office | 2022
|Fabricated cast-in-place non-dismantling formwork structural body
European Patent Office | 2022
|Fabricated cast-in-place slab strip suspended formwork system
European Patent Office | 2024
|