A platform for research: civil engineering, architecture and urbanism
Beam lifting equipment for erecting high bridge pier beam slab in mountain ridge area
The invention belongs to the field of bridge construction, particularly relates to beam lifting equipment for erecting high bridge pier beam slabs in a mountain ridge area, and aims to solve the problems that an existing process is limited by roadbed-free or short-roadbed engineering in an engineering project section, construction of a precast beam field cannot be met, and the bridge piers of viaducts in the mountain ridge area are generally high, so that the construction cost is low. In order to solve the problems that in the prior art, in order to solve the problem that a transportation channel for the beam transporting vehicle to walk cannot be built, the beam transporting vehicle comprises a plurality of beam plate bodies and four first supporting frames arranged among a plurality of bridge pier bases, foot pier faces used for containing the beam plate bodies are arranged at the tops of the bridge pier bases, and the four first supporting frames are symmetrically arranged in pairs; according to the device, the beam plate body can be supported by arranging the supporting assembly, the working efficiency is improved, the safety of the device is improved, construction can be conducted under the severe terrain, the two clamping plates can be used for clamping the foot pier face to adapt to the size of the foot pier face, and then the application range of the device can be widened.
本发明属于桥梁施工领域,尤其是一种用于山岭地区高桥墩梁板架设的提梁设备,针对现有的工艺受限于工程项目段落内无路基或短路基工程,无法满足预制梁场建设,且在山岭地区的高架桥普遍桥墩较高,无法修建满足运梁车行走的运输通道的问题,现提出如下方案,其包括多个梁板本体以及四个设置在多个桥墩基座之间的第一支撑架,所述桥墩基座的顶部设置有用于放置梁板本体的脚墩面,四个所述第一支撑架呈两两对称设置,本发明中,通过设置支撑组件可以支撑梁板本体,两不仅提升了工作效率,并且提升装置的安全性,可以在恶劣地形下进行施工,还能利用两个夹紧板夹紧脚墩面,适配脚墩面的尺寸,进而可以提升装置的适用范围。
Beam lifting equipment for erecting high bridge pier beam slab in mountain ridge area
The invention belongs to the field of bridge construction, particularly relates to beam lifting equipment for erecting high bridge pier beam slabs in a mountain ridge area, and aims to solve the problems that an existing process is limited by roadbed-free or short-roadbed engineering in an engineering project section, construction of a precast beam field cannot be met, and the bridge piers of viaducts in the mountain ridge area are generally high, so that the construction cost is low. In order to solve the problems that in the prior art, in order to solve the problem that a transportation channel for the beam transporting vehicle to walk cannot be built, the beam transporting vehicle comprises a plurality of beam plate bodies and four first supporting frames arranged among a plurality of bridge pier bases, foot pier faces used for containing the beam plate bodies are arranged at the tops of the bridge pier bases, and the four first supporting frames are symmetrically arranged in pairs; according to the device, the beam plate body can be supported by arranging the supporting assembly, the working efficiency is improved, the safety of the device is improved, construction can be conducted under the severe terrain, the two clamping plates can be used for clamping the foot pier face to adapt to the size of the foot pier face, and then the application range of the device can be widened.
本发明属于桥梁施工领域,尤其是一种用于山岭地区高桥墩梁板架设的提梁设备,针对现有的工艺受限于工程项目段落内无路基或短路基工程,无法满足预制梁场建设,且在山岭地区的高架桥普遍桥墩较高,无法修建满足运梁车行走的运输通道的问题,现提出如下方案,其包括多个梁板本体以及四个设置在多个桥墩基座之间的第一支撑架,所述桥墩基座的顶部设置有用于放置梁板本体的脚墩面,四个所述第一支撑架呈两两对称设置,本发明中,通过设置支撑组件可以支撑梁板本体,两不仅提升了工作效率,并且提升装置的安全性,可以在恶劣地形下进行施工,还能利用两个夹紧板夹紧脚墩面,适配脚墩面的尺寸,进而可以提升装置的适用范围。
Beam lifting equipment for erecting high bridge pier beam slab in mountain ridge area
一种用于山岭地区高桥墩梁板架设的提梁设备
ZHOU YUAN (author) / SHAO JIE (author) / ZHAO JIANJUN (author) / FENG JIANPING (author) / LI HUI (author) / HAN YONGLI (author) / LIU GUANGQI (author) / LI MUZI (author) / LI HE (author) / ZHANG HONGLI (author)
2023-11-10
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Construction method for erecting small-radius bridge precast beam in mountain ridge area
European Patent Office | 2023
|Bridge erecting machine for pier-beam integrated construction
European Patent Office | 2021
|Erecting method of pier-beam integrated construction bridge girder erection machine
European Patent Office | 2022
|Construction method for stably erecting bridge precast beam slab
European Patent Office | 2022
|High-pile wharf beam and slab erecting integrated equipment
European Patent Office | 2024
|