Water test debugging method for long drainage pipeline of cascade pump station
The invention relates to the technical field of long-distance water diversion, and discloses a water test debugging method for a long drainage pipeline of a cascade pump station, a water supply project is provided with five pump stations, namely a water intake pump station, a first booster pump station, a second booster pump station, a first pump station and a second pump station, and a high-level water tank is arranged along the line. According to the test water flow debugging method for the long drainage pipeline of the cascade pump station, a large system optimization decision model or a system simplification model is established, multiple optimization algorithms are adopted, and an analogue simulation technology is combined, so that the combined dispatching operation of units in each pump station is optimized; the mutual influence of the water volume and the water pressure among the cascade stations and the optimization combination problem among the stations are perfected, so that a relatively optimal engineering operation decision scheme is obtained, and the method has important theoretical and practical significance for economic operation of the cross-basin water transfer engineering and development of an optimization scheduling decision support system.
本发明涉及长距离引调水技术领域,且公开了一种梯级泵站长疏管线的试通水调试方法,所述供水工程共设有五座泵站,分别是取水泵站、一号加压泵站、二号加压泵站、某达一泵站、某达二泵站,沿线设一座高位水池。该梯级泵站长疏管线的试通水调试方法,通过本发明所涉及的梯级泵站调度试通水运行方法通过建立大系统优化决策模型或者系统简化模型,采用多种优化算法并结合仿真模拟技术,对各泵站内机组的联合调度运行进行优化,完善各梯级站之间水量和水压的相互影响以及各站之间的优化组合问题,从而得到相对最优的工程运行决策方案,对跨流域调水工程的经济运行和优化调度决策支持系统的开发具有重要的理论和实际意义。
Water test debugging method for long drainage pipeline of cascade pump station
The invention relates to the technical field of long-distance water diversion, and discloses a water test debugging method for a long drainage pipeline of a cascade pump station, a water supply project is provided with five pump stations, namely a water intake pump station, a first booster pump station, a second booster pump station, a first pump station and a second pump station, and a high-level water tank is arranged along the line. According to the test water flow debugging method for the long drainage pipeline of the cascade pump station, a large system optimization decision model or a system simplification model is established, multiple optimization algorithms are adopted, and an analogue simulation technology is combined, so that the combined dispatching operation of units in each pump station is optimized; the mutual influence of the water volume and the water pressure among the cascade stations and the optimization combination problem among the stations are perfected, so that a relatively optimal engineering operation decision scheme is obtained, and the method has important theoretical and practical significance for economic operation of the cross-basin water transfer engineering and development of an optimization scheduling decision support system.
本发明涉及长距离引调水技术领域,且公开了一种梯级泵站长疏管线的试通水调试方法,所述供水工程共设有五座泵站,分别是取水泵站、一号加压泵站、二号加压泵站、某达一泵站、某达二泵站,沿线设一座高位水池。该梯级泵站长疏管线的试通水调试方法,通过本发明所涉及的梯级泵站调度试通水运行方法通过建立大系统优化决策模型或者系统简化模型,采用多种优化算法并结合仿真模拟技术,对各泵站内机组的联合调度运行进行优化,完善各梯级站之间水量和水压的相互影响以及各站之间的优化组合问题,从而得到相对最优的工程运行决策方案,对跨流域调水工程的经济运行和优化调度决策支持系统的开发具有重要的理论和实际意义。
Water test debugging method for long drainage pipeline of cascade pump station
一种梯级泵站长疏管线的试通水调试方法
KONG CHUNYAN (author) / LIU CHAO (author)
2023-11-10
Patent
Electronic Resource
Chinese
IPC:
E03B
Anlagen oder Verfahren zum Gewinnen, Sammeln oder Verteilen von Wasser
,
INSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
Multi-station joint debugging intelligent drainage control method
European Patent Office | 2024
|