A platform for research: civil engineering, architecture and urbanism
Suspended ceiling structure for FFU installation
The suspended ceiling structure comprises a first lead screw, a second lead screw, first channel steel and an FFU fan filter unit, the first channel steel is arranged between the first lead screw and the second lead screw, a first connecting bearing piece is arranged at the bottom of the first lead screw after the first lead screw penetrates through the first channel steel, and a second connecting bearing piece is arranged at the bottom of the second lead screw after the second lead screw penetrates through the first channel steel. An FFU fan filter unit is arranged between the first connecting bearing part and the second connecting bearing part, and color steel plate suspended ceilings are arranged on the side, away from the FFU fan filter unit, of the first connecting bearing part and the side, away from the FFU fan filter unit, of the second connecting bearing part correspondingly. And meanwhile, a first reverse supporting assembly is further arranged above the side, away from the FFU, of the first lead screw, and a second reverse supporting assembly is further arranged above the side, away from the FFU, of the second lead screw, so that the structural strength is improved, and the air tightness is improved.
本发明提出一种用于FFU安装的吊顶结构,包括第一丝杆、第二丝杆、第一槽钢、FFU风机过滤单元,通过第一丝杆、第二丝杆之间设有第一槽钢,第一丝杆穿过第一槽钢后底部设有第一连接承载件,第二丝杆穿过第一槽钢后底部设有第二连接承载件,第一连接承载件与第二连接承载件之间设有FFU风机过滤单元,第一连接承载件远离FFU风机过滤单元侧、第二连接承载件远离FFU风机过滤单元侧均设有彩钢板吊顶,结构简单,同时在第一丝杆远离FFU风机过滤单元一侧的上方还设有第一反向支撑组件、第二丝杆远离FFU风机过滤单元一侧的上方还设有第二反向支撑组件,提高结构强度、提高气密性。
Suspended ceiling structure for FFU installation
The suspended ceiling structure comprises a first lead screw, a second lead screw, first channel steel and an FFU fan filter unit, the first channel steel is arranged between the first lead screw and the second lead screw, a first connecting bearing piece is arranged at the bottom of the first lead screw after the first lead screw penetrates through the first channel steel, and a second connecting bearing piece is arranged at the bottom of the second lead screw after the second lead screw penetrates through the first channel steel. An FFU fan filter unit is arranged between the first connecting bearing part and the second connecting bearing part, and color steel plate suspended ceilings are arranged on the side, away from the FFU fan filter unit, of the first connecting bearing part and the side, away from the FFU fan filter unit, of the second connecting bearing part correspondingly. And meanwhile, a first reverse supporting assembly is further arranged above the side, away from the FFU, of the first lead screw, and a second reverse supporting assembly is further arranged above the side, away from the FFU, of the second lead screw, so that the structural strength is improved, and the air tightness is improved.
本发明提出一种用于FFU安装的吊顶结构,包括第一丝杆、第二丝杆、第一槽钢、FFU风机过滤单元,通过第一丝杆、第二丝杆之间设有第一槽钢,第一丝杆穿过第一槽钢后底部设有第一连接承载件,第二丝杆穿过第一槽钢后底部设有第二连接承载件,第一连接承载件与第二连接承载件之间设有FFU风机过滤单元,第一连接承载件远离FFU风机过滤单元侧、第二连接承载件远离FFU风机过滤单元侧均设有彩钢板吊顶,结构简单,同时在第一丝杆远离FFU风机过滤单元一侧的上方还设有第一反向支撑组件、第二丝杆远离FFU风机过滤单元一侧的上方还设有第二反向支撑组件,提高结构强度、提高气密性。
Suspended ceiling structure for FFU installation
一种用于FFU安装的吊顶结构
XU MENGJIA (author) / SHI KEMIN (author) / QIAN JIANG (author) / CAO YU (author)
2023-11-10
Patent
Electronic Resource
Chinese
Suspended ceiling installation structure and installation method
European Patent Office | 2020
|Suspended ceiling installation component, suspended ceiling assembly and installation method thereof
European Patent Office | 2021
|European Patent Office | 2024
|European Patent Office | 2022
|