A platform for research: civil engineering, architecture and urbanism
Automatic pouring device for concrete construction
The invention belongs to the technical field of concrete pouring, and discloses a concrete construction automatic pouring device which comprises a concrete storage tank, the side face of one end of the concrete storage tank fixedly communicates with a feeding pipe, a movable tank is movably installed at the top end of the concrete storage tank, and the movable tank rotates relative to the concrete storage tank; and the top end of the movable tank fixedly communicates with a three-way valve. When the device is used for large-scale concrete pouring, concrete can be injected into the temporary storage pipe, the position of the weight box relative to the transverse guide rail is changed by increasing the capacity of the concrete, the gravity center of the device is balanced by changing the position, and only a valve of an electromagnetic valve needs to be controlled in the whole process; the gravity center of the device can be dynamically adjusted in the overall pouring process, so that pouring of the device is more stable, the problem that a traditional device is prone to inclination during large-scale pouring is solved, and the pouring stability of the device is improved.
本发明属于混凝土浇筑技术领域,且公开了一种混凝土施工自动浇筑装置,包括混凝土存储罐,所述混凝土存储罐的一端的侧面固定连通有进料管,所述混凝土存储罐的顶端活动安装有活动罐,所述活动罐相对混凝土存储罐转动,所述活动罐的顶端固定连通有三通阀。本发明通过在装置进行大范围的混凝土浇筑时,可通过将混凝土注入至暂存管的内部,并通过增加的混凝土的容量实现配重箱相对横向导轨位置的改变,通过位置的改变实现装置重心的平衡,整个过程只需要控制电磁阀的阀门即可,可在整体浇筑过程中动态调整装置的重心,使得装置的浇筑更加稳定,避免传统装置在大范围浇筑时易发生装置倾斜的问题,提高了装置的浇筑稳定性。
Automatic pouring device for concrete construction
The invention belongs to the technical field of concrete pouring, and discloses a concrete construction automatic pouring device which comprises a concrete storage tank, the side face of one end of the concrete storage tank fixedly communicates with a feeding pipe, a movable tank is movably installed at the top end of the concrete storage tank, and the movable tank rotates relative to the concrete storage tank; and the top end of the movable tank fixedly communicates with a three-way valve. When the device is used for large-scale concrete pouring, concrete can be injected into the temporary storage pipe, the position of the weight box relative to the transverse guide rail is changed by increasing the capacity of the concrete, the gravity center of the device is balanced by changing the position, and only a valve of an electromagnetic valve needs to be controlled in the whole process; the gravity center of the device can be dynamically adjusted in the overall pouring process, so that pouring of the device is more stable, the problem that a traditional device is prone to inclination during large-scale pouring is solved, and the pouring stability of the device is improved.
本发明属于混凝土浇筑技术领域,且公开了一种混凝土施工自动浇筑装置,包括混凝土存储罐,所述混凝土存储罐的一端的侧面固定连通有进料管,所述混凝土存储罐的顶端活动安装有活动罐,所述活动罐相对混凝土存储罐转动,所述活动罐的顶端固定连通有三通阀。本发明通过在装置进行大范围的混凝土浇筑时,可通过将混凝土注入至暂存管的内部,并通过增加的混凝土的容量实现配重箱相对横向导轨位置的改变,通过位置的改变实现装置重心的平衡,整个过程只需要控制电磁阀的阀门即可,可在整体浇筑过程中动态调整装置的重心,使得装置的浇筑更加稳定,避免传统装置在大范围浇筑时易发生装置倾斜的问题,提高了装置的浇筑稳定性。
Automatic pouring device for concrete construction
一种混凝土施工自动浇筑装置
MA JIANBIN (author)
2023-11-10
Patent
Electronic Resource
Chinese
Automatic concrete pouring device for building construction
European Patent Office | 2021
|Automatic concrete pouring device for building construction
European Patent Office | 2022
|Automatic concrete pouring device for building construction
European Patent Office | 2021
|Automatic concrete pouring device for building construction
European Patent Office | 2021
|Automatic concrete pouring device for building construction
European Patent Office | 2021
|