A platform for research: civil engineering, architecture and urbanism
Method for simply and conveniently hoisting materials at high altitude in venue room
The invention belongs to the technical field of high-altitude construction of buildings, and particularly relates to an indoor high-altitude simple and convenient material hoisting method for a stadium, which comprises the following steps of: presetting each hoisting point position according to a construction building drawing, and storing corresponding building materials at each point position; and at each preset hoisting point position in the above steps, hoisting devices with corresponding heights are installed according to the highest construction height. According to the method, it can be ensured that during large special-shaped indoor construction, all the point positions where materials need to be hoisted can cover, the stacking positions of the building materials can be reasonably planned, the potential safety hazards caused by disordered stacking can be avoided while the construction hoisting requirement is met, the mode of rapidly building the preset hoisting point positions on site is adopted, and the construction efficiency is improved. The lifting requirements of different heights are met, the lifting range is large, the lifting direction is flexible, and the convenience of lifting building materials in a large venue is greatly improved.
本发明属于建筑高空施工技术领域,尤其是涉及一种场馆室内高空简便吊运材料的方法,该吊运方法包括如下步骤:根据施工建筑图纸预设各个吊运点位,并在各个点位处存放对应的建筑材料;在上述步骤中各个预设的吊运点位,根据施工最高高度,安装相应高度的吊运装置。本发明可以确保大型异形室内施工时,各个需要吊运材料的点位均可以覆盖,合理规划建筑材料的堆放位置,满足施工吊运需求的同时,可以避免杂乱堆放导致的安全隐患,且采取在预设吊运点位现场快速搭建的方式,完成不同高度的吊运需求,吊运范围大,吊运方向灵活,大大提高大型场馆内部的建筑材料吊运的简便性。
Method for simply and conveniently hoisting materials at high altitude in venue room
The invention belongs to the technical field of high-altitude construction of buildings, and particularly relates to an indoor high-altitude simple and convenient material hoisting method for a stadium, which comprises the following steps of: presetting each hoisting point position according to a construction building drawing, and storing corresponding building materials at each point position; and at each preset hoisting point position in the above steps, hoisting devices with corresponding heights are installed according to the highest construction height. According to the method, it can be ensured that during large special-shaped indoor construction, all the point positions where materials need to be hoisted can cover, the stacking positions of the building materials can be reasonably planned, the potential safety hazards caused by disordered stacking can be avoided while the construction hoisting requirement is met, the mode of rapidly building the preset hoisting point positions on site is adopted, and the construction efficiency is improved. The lifting requirements of different heights are met, the lifting range is large, the lifting direction is flexible, and the convenience of lifting building materials in a large venue is greatly improved.
本发明属于建筑高空施工技术领域,尤其是涉及一种场馆室内高空简便吊运材料的方法,该吊运方法包括如下步骤:根据施工建筑图纸预设各个吊运点位,并在各个点位处存放对应的建筑材料;在上述步骤中各个预设的吊运点位,根据施工最高高度,安装相应高度的吊运装置。本发明可以确保大型异形室内施工时,各个需要吊运材料的点位均可以覆盖,合理规划建筑材料的堆放位置,满足施工吊运需求的同时,可以避免杂乱堆放导致的安全隐患,且采取在预设吊运点位现场快速搭建的方式,完成不同高度的吊运需求,吊运范围大,吊运方向灵活,大大提高大型场馆内部的建筑材料吊运的简便性。
Method for simply and conveniently hoisting materials at high altitude in venue room
一种场馆室内高空简便吊运材料的方法
RAO DAQUAN (author) / YE MEIJUAN (author) / LU HONGKANG (author) / WANG HUICONG (author)
2023-11-14
Patent
Electronic Resource
Chinese
Method for simply and conveniently preparing LaGaO3-based electrolyte sheet
European Patent Office | 2023
|