A platform for research: civil engineering, architecture and urbanism
Tower crane foundation and construction method thereof
The invention relates to the field of engineering construction, in particular to a tower crane foundation and a construction method thereof. The method comprises the steps of geological confirmation, foundation base inspection, tower body bottom section installation, tower body reinforcing frame installation, tower body sleeve frame installation, tower cap installation, balance arm installation, cargo boom installation, balance weight block installation, attachment installation, tower crane debugging, steel wire rope threading, platform installation and jacking section adding. The foundation base inspection is used for confirming the stress stability of the tower crane, hoisting the tower body reinforcing frame to the top by the cargo boom and climbing the tower body sleeve frame, so that the top of the tower body reinforcing frame is bright, the tower body reinforcing frame is further mounted, the top height of the tower crane is increased, and the tower crane can be used for hoisting a high sample piece; and the arrangement of the balance arm and the attachment is beneficial to ensuring the stable stress of the tower crane. The device has the effects that the installation position of the tower crane is prevented from being limited, and the applicability of the device is improved.
本申请涉及工程建筑领域,尤其涉及一种塔吊基础及其施工方法,其包括地质确认、基础底座检查、塔身底节安装、塔身加强架安装、塔身套架安装、塔帽安装、平衡臂安装、起重臂安装、平衡配重块安装、附着安装、塔吊调试、钢丝绳穿引、平台安装和顶升加节工序,地质确认用于确认塔吊安装的受力,基础底座检查用于确认塔吊受力的稳定性,起重臂吊装塔身加强架至顶部,塔身套架进行爬升,从而使得塔身加强架顶部亮风,将塔身加强架进步安装,使得塔吊顶部高度升高,有利于塔吊对于高度样件进行吊装,平衡臂和附着的设置有利于保证塔吊的稳定受力。本申请具有避免塔吊安装位置受限,增加装置的适用性的效果。
Tower crane foundation and construction method thereof
The invention relates to the field of engineering construction, in particular to a tower crane foundation and a construction method thereof. The method comprises the steps of geological confirmation, foundation base inspection, tower body bottom section installation, tower body reinforcing frame installation, tower body sleeve frame installation, tower cap installation, balance arm installation, cargo boom installation, balance weight block installation, attachment installation, tower crane debugging, steel wire rope threading, platform installation and jacking section adding. The foundation base inspection is used for confirming the stress stability of the tower crane, hoisting the tower body reinforcing frame to the top by the cargo boom and climbing the tower body sleeve frame, so that the top of the tower body reinforcing frame is bright, the tower body reinforcing frame is further mounted, the top height of the tower crane is increased, and the tower crane can be used for hoisting a high sample piece; and the arrangement of the balance arm and the attachment is beneficial to ensuring the stable stress of the tower crane. The device has the effects that the installation position of the tower crane is prevented from being limited, and the applicability of the device is improved.
本申请涉及工程建筑领域,尤其涉及一种塔吊基础及其施工方法,其包括地质确认、基础底座检查、塔身底节安装、塔身加强架安装、塔身套架安装、塔帽安装、平衡臂安装、起重臂安装、平衡配重块安装、附着安装、塔吊调试、钢丝绳穿引、平台安装和顶升加节工序,地质确认用于确认塔吊安装的受力,基础底座检查用于确认塔吊受力的稳定性,起重臂吊装塔身加强架至顶部,塔身套架进行爬升,从而使得塔身加强架顶部亮风,将塔身加强架进步安装,使得塔吊顶部高度升高,有利于塔吊对于高度样件进行吊装,平衡臂和附着的设置有利于保证塔吊的稳定受力。本申请具有避免塔吊安装位置受限,增加装置的适用性的效果。
Tower crane foundation and construction method thereof
一种塔吊基础及其施工方法
ZHANG JIANPING (author)
2023-11-14
Patent
Electronic Resource
Chinese
Tower crane foundation for foundation pit and construction method of tower crane foundation
European Patent Office | 2020
|Combined tower crane foundation and construction method thereof
European Patent Office | 2015
|