Stainless steel gutter construction process
The invention discloses a stainless steel gutter construction technology, and relates to the technical field of steel structure buildings. In order to solve the water leakage problem, the stainless steel gutter comprises a framework, a bottom plate fixed to the framework, heat preservation cotton laid on the bottom plate, a gutter panel fixed to the inner side of the middle of the framework, a waterproof coiled material laid on the whole and flashing plates laid on the tops of the two sides of the waterproof coiled material. The construction process of the stainless steel gutter comprises the following steps: surveying and setting out, setting out and calibrating the three-dimensional size of each mounting point by using a total station according to a drawing, determining a mounting position, mounting a gutter structure, and carrying out a gutter water storage test. According to the method, after the gutter structure is installed, a water closing experiment after water is injected into the gutter is added, so that water leakage points caused by defects in the welding process can be effectively detected, then the water leakage points are repaired, water leakage in the gutter using process can be prevented, and the construction quality of the gutter is improved.
本发明公开了一种不锈钢天沟施工工艺,涉及钢结构建筑技术领域。为了解决漏水问题,该不锈钢天沟包括骨架、固定于骨架上的底板、铺设于底板上的保温棉、固定于骨架中部内侧的天沟面板、铺设于整体表现的防水卷材以及铺设于防水卷材两侧顶部上的泛水板,所述不锈钢天沟施工工艺包括以下步骤:测量放线,按照图纸使用全站仪对每个安装点的三维尺寸进行放线标定,确定安装位置,天沟结构安装,天沟蓄水试验。本发明在天沟结构安装完毕后,增加对天沟注水后的闭水实验,从而可有效地检测出焊接过程中存在缺陷导致的漏水点,再对漏水点修补后即可,从而可防止天沟使用中漏水,增加了天沟的施工质量。
Stainless steel gutter construction process
The invention discloses a stainless steel gutter construction technology, and relates to the technical field of steel structure buildings. In order to solve the water leakage problem, the stainless steel gutter comprises a framework, a bottom plate fixed to the framework, heat preservation cotton laid on the bottom plate, a gutter panel fixed to the inner side of the middle of the framework, a waterproof coiled material laid on the whole and flashing plates laid on the tops of the two sides of the waterproof coiled material. The construction process of the stainless steel gutter comprises the following steps: surveying and setting out, setting out and calibrating the three-dimensional size of each mounting point by using a total station according to a drawing, determining a mounting position, mounting a gutter structure, and carrying out a gutter water storage test. According to the method, after the gutter structure is installed, a water closing experiment after water is injected into the gutter is added, so that water leakage points caused by defects in the welding process can be effectively detected, then the water leakage points are repaired, water leakage in the gutter using process can be prevented, and the construction quality of the gutter is improved.
本发明公开了一种不锈钢天沟施工工艺,涉及钢结构建筑技术领域。为了解决漏水问题,该不锈钢天沟包括骨架、固定于骨架上的底板、铺设于底板上的保温棉、固定于骨架中部内侧的天沟面板、铺设于整体表现的防水卷材以及铺设于防水卷材两侧顶部上的泛水板,所述不锈钢天沟施工工艺包括以下步骤:测量放线,按照图纸使用全站仪对每个安装点的三维尺寸进行放线标定,确定安装位置,天沟结构安装,天沟蓄水试验。本发明在天沟结构安装完毕后,增加对天沟注水后的闭水实验,从而可有效地检测出焊接过程中存在缺陷导致的漏水点,再对漏水点修补后即可,从而可防止天沟使用中漏水,增加了天沟的施工质量。
Stainless steel gutter construction process
一种不锈钢天沟施工工艺
BIAN KELEI (author) / ZHENG CHENGLI (author) / WANG YANG (author) / LI JIE (author) / JIANG BING (author) / DAI HUIFU (author) / CAO MING (author) / XU YARU (author) / GAO WENGUANG (author) / HAN JIANCHENG (author)
2023-11-14
Patent
Electronic Resource
Chinese
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
GUTTER MOUNTING MEMBER, GUTTER STRUCTURE, AND CONSTRUCTION METHOD FOR GUTTER STRUCTURE
European Patent Office | 2024
|SIDE GUTTER COVER, SIDE GUTTER AND CONSTRUCTION METHOD THEREFOR
European Patent Office | 2016
|