A platform for research: civil engineering, architecture and urbanism
Subway deep foundation pit concrete waist beam breaking method
The invention discloses a subway deep foundation pit concrete waist beam breaking method which comprises the following steps that a supporting beam is divided into blocks, marks are made, and PVC pipes are embedded in concrete waist beam pouring concrete every 2 m; building stirrups or forklifts for assisting; cutting with a wire saw; dicing, hoisting and outward transporting; a crawler crane is matched with a forklift, and the concrete waist beam is cut in blocks, lifted out of a foundation pit and finally stored and broken in a centralized mode in a field area. According to the subway deep foundation pit concrete waist beam breaking method provided by the invention, the surface of the concrete waist beam cut by using the rope saw is smooth and flat, the basal plane treatment is not needed, the cyclic connection between the working procedures is accelerated, and the cutting efficiency is improved by utilizing the matching of the crawler crane and the forklift.
本发明公开了一种地铁深基坑砼腰梁破除方法,包括以下几个步骤:支撑梁分块划分,做好记号,在砼腰梁浇筑混凝土钱每隔2m埋设PVC管;搭设马镫或叉车辅助;绳锯切割;切块、吊装、外运;采用履带吊和叉车配合,将砼腰梁进行分块切割,吊出基坑,最后在场区内进行集中存放破除。本发明提供的地铁深基坑砼腰梁破除方法,使用绳锯切割处理的砼腰梁表面光滑、平整,无需在进行基面处理,加快了工序之间的循环衔接,利用履带吊和叉车配合,提高了切割的效率。
Subway deep foundation pit concrete waist beam breaking method
The invention discloses a subway deep foundation pit concrete waist beam breaking method which comprises the following steps that a supporting beam is divided into blocks, marks are made, and PVC pipes are embedded in concrete waist beam pouring concrete every 2 m; building stirrups or forklifts for assisting; cutting with a wire saw; dicing, hoisting and outward transporting; a crawler crane is matched with a forklift, and the concrete waist beam is cut in blocks, lifted out of a foundation pit and finally stored and broken in a centralized mode in a field area. According to the subway deep foundation pit concrete waist beam breaking method provided by the invention, the surface of the concrete waist beam cut by using the rope saw is smooth and flat, the basal plane treatment is not needed, the cyclic connection between the working procedures is accelerated, and the cutting efficiency is improved by utilizing the matching of the crawler crane and the forklift.
本发明公开了一种地铁深基坑砼腰梁破除方法,包括以下几个步骤:支撑梁分块划分,做好记号,在砼腰梁浇筑混凝土钱每隔2m埋设PVC管;搭设马镫或叉车辅助;绳锯切割;切块、吊装、外运;采用履带吊和叉车配合,将砼腰梁进行分块切割,吊出基坑,最后在场区内进行集中存放破除。本发明提供的地铁深基坑砼腰梁破除方法,使用绳锯切割处理的砼腰梁表面光滑、平整,无需在进行基面处理,加快了工序之间的循环衔接,利用履带吊和叉车配合,提高了切割的效率。
Subway deep foundation pit concrete waist beam breaking method
地铁深基坑砼腰梁破除方法
WANG ZHIQIANG (author) / DING FEI (author) / ZHANG JIANJIAN (author) / ZOU XING (author) / SU YANQU (author) / LI ZHIJIANG (author)
2023-11-14
Patent
Electronic Resource
Chinese
Deep foundation pit precast concrete waist beam mounting equipment and using method
European Patent Office | 2023
|Deep foundation pit permanent waist beam waterproof device and construction method
European Patent Office | 2023
|Construction method for accelerating cutting of waist beam in foundation pit supporting concrete
European Patent Office | 2024
|Deep foundation clearing construction method for deep foundation pit near subway
European Patent Office | 2021
|Continuous foundation pit waist beam and construction method thereof
European Patent Office | 2021
|