Slope fixing method for abrupt slope of loose sand layer of mining pit based on novel KEP material
The invention discloses a mining pit loose sand layer steep slope fixing method based on a KEP novel material. The method comprises the following steps that S1, a site is leveled, specifically, a pit bottom and a slope surface are leveled; s2, a gelatinized sand gravel layer and a panel concrete layer are laid in sequence; s3, hanging an active net; the method is suitable for the technical field of sand excavation pit treatment, firstly, the pit bottom and the slope surface are cleaned and leveled, then, the cemented sand gravel layer and the panel concrete layer are fixedly arranged in the mode that the side wall is extruded to fix the slope, and finally, the novel KEP material is sprayed after a driving net is hung, so that slope fixing of the abrupt side wall of the loose sand layer of the pit is completed, and on the premise that the side wall is not damaged, the slope of the abrupt side wall of the loose sand layer is fixed. The treatment of the high and steep landslide is realized.
本发明公开了基于KEP新型材料的采坑松散砂层陡立边帮固坡方法,包括以下步骤:S1场地平整:将坑底和坡面整平;S2依次铺设胶凝砂砾石层和面板混凝土层;S3挂设主动网;S4KEP新型材料喷浆,本发明适用于采砂坑治理技术领域,先将坑底和坡面清理平整,然后通过挤压边墙固坡的方式固设胶凝砂砾石层和面板混凝土层,最后挂主动网后喷涂KEP新型材料,从而完成坑松散砂层陡立边帮固坡,在不破坏边帮的前提下,实现了高陡滑坡的治理。
Slope fixing method for abrupt slope of loose sand layer of mining pit based on novel KEP material
The invention discloses a mining pit loose sand layer steep slope fixing method based on a KEP novel material. The method comprises the following steps that S1, a site is leveled, specifically, a pit bottom and a slope surface are leveled; s2, a gelatinized sand gravel layer and a panel concrete layer are laid in sequence; s3, hanging an active net; the method is suitable for the technical field of sand excavation pit treatment, firstly, the pit bottom and the slope surface are cleaned and leveled, then, the cemented sand gravel layer and the panel concrete layer are fixedly arranged in the mode that the side wall is extruded to fix the slope, and finally, the novel KEP material is sprayed after a driving net is hung, so that slope fixing of the abrupt side wall of the loose sand layer of the pit is completed, and on the premise that the side wall is not damaged, the slope of the abrupt side wall of the loose sand layer is fixed. The treatment of the high and steep landslide is realized.
本发明公开了基于KEP新型材料的采坑松散砂层陡立边帮固坡方法,包括以下步骤:S1场地平整:将坑底和坡面整平;S2依次铺设胶凝砂砾石层和面板混凝土层;S3挂设主动网;S4KEP新型材料喷浆,本发明适用于采砂坑治理技术领域,先将坑底和坡面清理平整,然后通过挤压边墙固坡的方式固设胶凝砂砾石层和面板混凝土层,最后挂主动网后喷涂KEP新型材料,从而完成坑松散砂层陡立边帮固坡,在不破坏边帮的前提下,实现了高陡滑坡的治理。
Slope fixing method for abrupt slope of loose sand layer of mining pit based on novel KEP material
基于KEP新型材料的采坑松散砂层陡立边帮固坡方法
LIU RUIPING (author) / XU YOUNING (author) / LIU FEI (author) / CHEN JUNLU (author) / CHEN HUAQING (author) / ZHANG FANG (author) / ZHANG YIBING (author) / WANG SHUOSEN (author)
2023-11-17
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Support thick-layer base material abrupt slope regreening structure
European Patent Office | 2015
|European Patent Office | 2023
|Greening structure for slope protection of abrupt slope mountain
European Patent Office | 2022
|