A platform for research: civil engineering, architecture and urbanism
High-rise building over-limit load monitoring equipment
The invention relates to the technical field of constructional engineering, in particular to high-rise building overrun load monitoring equipment which comprises a main body and a building pile, a correction mechanism is arranged on the surface of the building pile, and a bisection mechanism and a lifting mechanism are arranged on the correction mechanism; the correcting mechanism comprises a supporting plate, a cylinder is fixedly connected to the surface of the supporting plate, a driving motor is fixedly connected to the surface of the cylinder, an output shaft is arranged on the surface of the driving motor, the output shaft of the driving motor is fixedly connected with a first gear, and the output shaft of the driving motor drives the first gear to rotate. The problem that the disc is placed inaccurately can be solved, balance and accurate alignment between the disc and the building pile are ensured, errors of detection data are reduced, meanwhile, weight distribution of borne objects on the top of the disc is balanced, uniform distribution of borne objects on the building pile is ensured, local pressure is reduced, and the service life of the building pile is prolonged. And the safety risk caused by uneven stress of the building pile is reduced, and the accident rate is reduced.
本发明涉及建筑工程技术领域,具体为一种高层建筑超限载荷监测设备,包括:主体,建筑桩,所述建筑桩的表面上设置有矫正机构,所述矫正机构上设置有平分机构以及升降机构;矫正机构,包括支撑板,所述支撑板的表面上固定连接有圆筒,所述圆筒的表面上固定连接有驱动电机,所述驱动电机的表面上设置有输出轴,所述驱动电机的输出轴固定连接第一齿轮,所述驱动电机的输出轴带动第一齿轮转动。本发明可以解决圆盘放置位置不准确的问题,确保圆盘与建筑桩之间的平衡和准确对齐,从而减少检测数据的误差,同时平衡了圆盘顶部承载物的重量分布,确保在建筑桩上的承载均匀分布,降低局部压力,减少建筑桩的受力不均带来的安全风险,降低了事故发生率。
High-rise building over-limit load monitoring equipment
The invention relates to the technical field of constructional engineering, in particular to high-rise building overrun load monitoring equipment which comprises a main body and a building pile, a correction mechanism is arranged on the surface of the building pile, and a bisection mechanism and a lifting mechanism are arranged on the correction mechanism; the correcting mechanism comprises a supporting plate, a cylinder is fixedly connected to the surface of the supporting plate, a driving motor is fixedly connected to the surface of the cylinder, an output shaft is arranged on the surface of the driving motor, the output shaft of the driving motor is fixedly connected with a first gear, and the output shaft of the driving motor drives the first gear to rotate. The problem that the disc is placed inaccurately can be solved, balance and accurate alignment between the disc and the building pile are ensured, errors of detection data are reduced, meanwhile, weight distribution of borne objects on the top of the disc is balanced, uniform distribution of borne objects on the building pile is ensured, local pressure is reduced, and the service life of the building pile is prolonged. And the safety risk caused by uneven stress of the building pile is reduced, and the accident rate is reduced.
本发明涉及建筑工程技术领域,具体为一种高层建筑超限载荷监测设备,包括:主体,建筑桩,所述建筑桩的表面上设置有矫正机构,所述矫正机构上设置有平分机构以及升降机构;矫正机构,包括支撑板,所述支撑板的表面上固定连接有圆筒,所述圆筒的表面上固定连接有驱动电机,所述驱动电机的表面上设置有输出轴,所述驱动电机的输出轴固定连接第一齿轮,所述驱动电机的输出轴带动第一齿轮转动。本发明可以解决圆盘放置位置不准确的问题,确保圆盘与建筑桩之间的平衡和准确对齐,从而减少检测数据的误差,同时平衡了圆盘顶部承载物的重量分布,确保在建筑桩上的承载均匀分布,降低局部压力,减少建筑桩的受力不均带来的安全风险,降低了事故发生率。
High-rise building over-limit load monitoring equipment
一种高层建筑超限载荷监测设备
YIN WANSHUN (author) / ZHU TAIKANG (author) / ZHAO SONG (author) / ZHENG LEI (author) / WANG YAFEI (author) / QUAN YOUWEI (author)
2023-11-17
Patent
Electronic Resource
Chinese
High-rise building demolition equipment and high-rise building demolition method
European Patent Office | 2023
|Explosion Load in a High-Rise Building Design
British Library Conference Proceedings | 2005
|Explosion Load in a High-Rise Building Design
British Library Conference Proceedings | 2005
|